thank you this is william little i'm going to call the regular meeting of the board of commissioners for the city of las cruces to utilities to order and first of all i'm going to ask adrian to give us the the required briefing to comply with the ag's requirements that's adrian guzman okay well then i will go ahead and and proceed with that this this meeting is being conducted remotely and uh it is also being live streamed on youtube in order to comply with the open meetings aspects of this new way of doing business everyone needs to remember to identify themselves when they begin to speak and any votes that we take during the meeting will be by roll call and if for some reason the link to the outside world fails we will have to suspend the meeting until that link is re-established now um we have a brand new city manager this week and uh is he on the meeting today i don't think so we we will give him a chance to uh to introduce himself when he does join the next order of business is the conflict of interest is there any member of the board or any member of city staff who has any conflict of interest with any item on the agenda now if we have to do it by name commissioner archuleta now commissioner ben cuomo none mr carmichael no mr hardy none johnson okay commissioner johnson is uh is not at his desk at the moment commissioner sword yes no i don't have any thank you uh and the chair none and uh staff no sir nothing from staff this is delilah thank you the next order of business is the acceptance of the agenda i have a motion to accept the agenda move to approve thank you that's sword second carmichael thank you any additions or corrections to the agenda hearing none ready for a vote chair archuleta vice chair archuleta commissioner ben cuomo yes mr carmichael yes mr hardy yes mr johnson uh still absent from his desk commissioner sorg yes and the chair yes thank you all okay uh next item of business is public participation were there any email messages from the public delilah walsh interim director mr chair no we do not have any thank you so much the next item is the administrative report go ahead good afternoon chairman commissioners this is uh provencio uh deputy director of business services uh i'll brief you on activity ongoing in the in the building and receivables area with respect to utility assistance programs uh the current slide and the following slide provide the activity for the month of august and the numbers pretty much uh present the level activity at this point and if i could ask the the next slide be uh forwarded the information here presented that is uh the remaining programs especially topic of interest is the the casa de peregrinos uh assistance fund uh this month or for the prior month excuse me uh there was 205 residential customers that received some assistance totaling a little over 39 and ten businesses that were assisted that received a little a little under seven thousand dollars in assistance if we can forward to the next page would be a the chart and presenting the uh the overall numbers that have been expensed excuse me the funds that have been expensed and the remaining balance at a little under a little over 23 thousand dollars and that would provide that provides the summary of what happened activity last month and i'll stand by for any questions questions no okay all right thank you go ahead we can forward or link up to the the slides that present the budget adjustments for up to uh this last month um joe if i could interrupt you i'm sorry again lila walsh interim director uh mr chairman i did want to let you know that our our new city manager mr pealey has been able to join us yes i saw that thank you um since we're since we're paused uh let us welcome mr pealey to the board meeting we're glad to have you on board we are looking forward to working with you and looking forward to meeting with you as soon as practicable we do want to make sure that you have an opportunity to learn more about the utilities system here in las cruces and how it works it's somewhat different from a way that many utilities work we're really very proud of it and and we want a chance to share that with you thank you very much i i really uh i i've heard a lot of a lot of great things about our utilities and and i know it's uh they're all true yeah i bet they are i bet they are but i appreciate you uh allowing me to to jump on i apologize for jumping on late okay back to budget adjustments thank you chair uh chairman commissioners if we uh what i going forward uh staff will be uh providing information on um on budget adjustments that have that are done submitted and processed by the budget office uh the main reason uh for this level of information is to give you give the board an idea of the magnitude and the number of adjustments that are fairly it's it's a process that's fairly common because things change and things have to be tuned in with uh uh pardon me uh that uh tracked any changes to the original budget that was passed earlier uh for this fiscal year uh the adjustments are are done on a quarterly basis again by the budget office and uh there's uh there's a number of them and uh the the information pretty much it provides the magnitude of the dollars and the reason uh for [Music] they know you're busy well i didn't forward it that's my fault um [Music] let me take let me pick up where i left off it it provides the the activity by each one of the operating uh groups and with the information that's presented i'll stand by for any uh questions or specific questions that you may have on these budget adjustments oh yeah one more item excuse me the number that we have here is is pretty much it's a catch-up mode in terms of at the start of the at the start of the uh uh the fiscal year so again i will step step aside and stand by for any questions you may have mr chairman delilah walsh interim utilities director i do want to just let you know we have provided you with nine or ten pages of the budget adjustments if you have specific questions joke we didn't go through every single one as joe mentioned this is mostly the cleanup to true up accounts at the end of the fiscal year and then account for any carryovers of purchases that were maybe pending within fy20 and carried over to fy 21 so in other words we started the purchase but didn't complete it until the new fiscal year so we have quite a bit out there um but as joe mentioned if you have any questions we're happy to address that thank you questions mr carmichael um joe could you just remind us i'm pretty sure i know but the fiber optic adjustment that was made in each of the lines of business talk about that a little bit uh chairman commissioner carmichael uh well i will defer to uh to dominique rodriguez manager of uh rate and economic analysis uh who's uh spearheads these these changes if i can ask dominique to step in and help you sure chairman commissioner this is dominique rodriguez the raiden economic analysis manager so this is a portion for gas water wastewater and solid waste for the fiber optic project um that is on the cip um and it's bringing it down amador i believe up into a certain point and so we wanted to budget the utilities portion in order uh to get this project going and moving forward thank you you're welcome anything else okay go ahead what we'll do now is return to the regular presentation it does take a moment for us to switch over all right again delilah walsh interim director and i will introduce mr mario puentes who is our gas analyst mario yes good afternoon mr chairman commissioners yes mario puentes gas business analyst um this briefing here is related to the reappointment of certain staff city staff members to the new mexico municipal energy acquisition authority's board of directors or namia for short now i know not everybody has heard of nemia so i'll just give you a little bit of background the mia is a joint powers authority that was created in 2008 by the cities of las cruces and gallup with its main purpose being to obtain energy supplies upon favorable terms including a discount from market prices and to make that supply available to new mexico municipal utility retail customers sonomia currently sells gas to the cities of las cruces and farmington into the county of los alamos and even though namia is a kind of a creature of the city and the state it sells gas to las cruces via a natural gas contract that was approved by the lcu board and to date the las cruces gas customers have saved close to 1.07 million dollars and so it's kind of following what we had anticipated that over the 30-year term it would be a little over three million dollars next slide please so the the joint powers agreement of nemia stipulates that nemia be governed by a seven-member board of directors with las cruces gallup and farmington each represented by two directors and los alamos gets to a point one they are appointed to four-year terms and may be reappointed and they must possess current experience in the operation of municipal utilities or the acquisition of energy supplies and or be familiar with municipal finance in general next slide please since the creation of nemia the city has appointed the utilities and finance directors or their designees to sit on the board and utility staff has recommended to the council to go ahead and reappoint the utilities and finance directors or their designees and that recommendation will be considered at the september 21st 2020 city council meeting and i'd like to point out that the the appointments are by position so the the resolution will actually just state utilities director and finance director versus naming specific individuals so we wanted to provide you this uh kind of as a heads up on this particular matter mr chairman and i will stand for questions thank you uh in our particular case the director uh position would be the interim director yes mr sherman that is correct uh the interim director fulfills all the uh not only the requirements of what nami is looking for but she she is the she is the director all right thank you so much yes sir anything else i have a question mr chairman go ahead how often do you meet and who is the chairman uh yes mr chairman council uh commissioner archuleta generally uh the board meets once once or twice a year uh number one to uh uh approve the budget and and also to elect officers the uh the we had a meeting uh late last month i believe we're in september now right so yes sir late august and the new chair is uh the gentleman from gallup the the former chair is indicated he's retiring sometime soon and he was from los alamos and then of course the vice chair was uh dr garcia who has retired as well and they and they sit for the the uh the yeah one year so every year they that we we elect new officers okay thank you yes sir anything else no mr chairman all right thank you mario next mr chair commissioners next we'll have our lcu human resources activity report i do want to point out our vacancies as of september 1st have risen to 53. they were at 55 we brought down two before the end of the month or the start of the month i will point out you can see uh our vacancies were hovering and starting to improve and hovering around the 40 45 vacancies area and shortly after covid19 and operational changes they've been rising quite steadily vacancies is starting to impact us and so and i think i shared last month typically what happens is it takes an employee two weeks to four weeks to vacate a position let us know they're retiring they're going to be moving on or whatever that may be however it's taking us an average of 40 weeks to fill that position so using that data it's virtually impossible for us to overcome our current vacancy level as it is and i really anticipate it's only going to keep rising based on current conditions um one of the situations we're facing now is we have almost 30 percent of our staff has well over 220 hours of accrued annual leave as i've reported in our sit rep and i'll mention it again later on the city has decided that they will not extend the annual leave carryover beyond 240 hours which is currently allowed therefore we do need to let's start letting our staff have time off in order to burn that annual leave down before they lose it so as i mentioned almost 30 percent of our staff 70 to 85 people are in that 200 hour range i believe 70 already over 240 hours so with that i've advised the deputy directors if we need to in order to keep up operationally we can start hiring temporary staff the reason being it only takes us two weeks to hire a temp staffer versus 40 weeks to bring in a regular fte so long as that temp staffer is not replacing an fte and what i mean by that is that the ft it's only a short term situation until we get that position filled we can do that with temporary staff as you know we've been working hard to reduce temporary staff but right now quite frankly that's the only resolution i see that's viable temporary staff is not the only solution because as you know we have highly qualified skilled and skilled sets as well as certification requirements and many of our lines in business particularly in water waste water and gas even with solid waste we have to have a cdl driver and it takes about 80 hours of training on the equipment before before we can let that driver out on the road so it's not a great solution but it is a solution in addition to that we've been keeping up operationally our overtime is excessive and i don't mean it successes in the fact that it's unaffordable for the utility obviously with the vacancy savings we can afford and even last year with as much overtime as we had we came in under budget with operations just slightly but we are using overtime the impact that's had on staff is obviously they're getting tired and it does impact our morale so the combination of the fact that we've remained 100 operational through this entire covid pandemic our staff hasn't been able to use their annual even is thus cure accruing quite a bit in addition to the fact that we have significant vacancies in our departments all those combined are taking a toll on our staff at this point um there may be operational effects as we start to allow them to have leave in the sense that we may not be able to address leaks as fast or new connections as fast or filled inspections as fast as we do today so the two the one thing i want to first emphasize is operationally we're doing great we're keeping up but we're doing that on the backs of our staff because we're unable to give them that relief that they need by filling those vacancies the chart on the right will show you our progress or at least the change the net change in vacancies within our lines of business nothing much has changed since last month obviously we've seen more success in improving changes in water we are finally seeing processes move forward in gas and it's just a matter of getting that workflow done faster rather than later regarding our commissioners have to go out there and help out we may be getting to that point i hate to be facetious but i mean it it feels that way some days all right michael i have a question didn't we have didn't we have pretty good assurance at one time that we would be able to have some kind of carryover carry over of i believe of the short haul oh thank you thank you commissioner carmichael mr chair commissioner we had been asking that through our situation report however based on the potential liability faced by the city so uh for just for a brief explanation when you express on your financial statements a liability such as leave meaning that at some point the city has to pay out that leave whether it be during the year or at the end of an employee's employment i.e they retire that is a liability we carry on our books so the city as a whole cannot afford to express such a large liability with that much leave on the books and so it is better for us to burn it off and i believe uh interim city manager david maestas has raised his hand and he may be able to expand on that because that is an executive decision at the city hall level mr marisa go ahead yes thank you mr chair thank you delilah for sending that over for me for additional discussion on their uh utility commissioners i am david maestas uh technically i think uh my title is advisor to the city manager at this time so we will go by that title for this discussion with respect to carryover the carryover that we had been talking about previously and other discussions was specific to the extraordinary leave that had been offered to staff extraordinary leave had been offered to all staff but in some instances and as delilah has been pointing out a lot of utility staff was not able to take that leave or utilize that lead so we said that in order to remain fair everybody would still be able to and have access to that leave if they have not used it so that one we are still allowing staff to carry it over if they have not used the leave the extraordinary leave yet they will be able to take that into the next calendar year and utilize it at different opportunities throughout the year however as delilah pointed out for the the annual leave itself uh carrying over more than the 240 does continue to have a liability for the city and it's something that has never been offered through any of the years so we're just maintaining consistency with that as well again the one difference that we have caused by the pandemic was the extraordinary leave and that one will be allowed to be carried over thank you okay thank you for that explanation um i believe that the board would say we are disappointed with that decision i have one question and then commissioner johnson is next earlier this week there was a press release that the city was going to award a one-time payment for frontline staff and i am presuming that that includes utility staff is that true mr chairman commissioners delilah here yes sir we are considered part of the critical infrastructure staff and when the city management had reached out in april to identify those employees who continued to report to work which was pretty much the entire utility i think we had a handful of people who were able to work remotely 100 percent but um we were included in that evaluation and with that list thank you uh commissioner hardy no sorry commissioner johnson okay i i have the same question because the the press release doesn't mention utilities in any shapeway or form and sir that that is correct uh commissioner johnson uh mr chairman we we are critical infrastructure staff and that was the definition under the federal rules but the press release just doesn't mention this correct once once again we're an invisible profession okay go ahead with the profession with the hiring thank you sir um as you know our own goal within the strategic business plan is to fill our vacancies within six weeks hr's goal within their strategic business plan is to do that within 10 weeks but as i explained earlier and as you can see by these charts the weeks and process is only growing and right now we're averaging 40 weeks to get a position filled so that means that these positions again may be vacated in two to four weeks but it's taking us 12 to 40 weeks what's interesting is a lot of eye hiring is internal and even an internal transfer i'll give one example we have a gentleman moving from i believe wastewater to solid waste we had all the paperwork in four weeks ago but we had to make a memo correction which we just got back last week and now it's being processed and finally loaded into the system for pas so it's it's just simply a workload issue and so even internal transfers are taking a long time to get through the pipeline as you see from the chart on the right we do track work stoppage when it comes to the hiring workflow process 77 of our stoppages as of the first of the month we're at hr and 19 we're on our side the 4 in flow means that the person has been hired but we're waiting on their start date so in other words we have a start date we know where they're going to start but the actual human person has not yet shown up so we we track that as an inflow okay thank you it's not all bad news we have filled those positions we filled 46 positions just since october however because there are a lot of internal promotions because again remember we're a very skill set heavy and certification heavy organization within the department a lot of those happen internally so once we get them transferred into that new position then it starts the hiring process all over it again to open up that that entry level position within those those delays we are still awaiting five reclassification requests and those are the positions which hadn't been filled for more than a year and weren't used and weren't actively recruited so we reclassified them to use them in other areas where we identified need and those have been in since october we're waiting for four new job descriptions that we've remitted the paqs again we can't open up those jobs until we have a job description in hand and on neogov we're awaiting four positions we're just waiting on release of candidates and what that means is the application cycle has closed in neogov and the candidates are there but hr has to run the filter for qualifications and then release those candidates to our hiring managers we have nine positions that are still waiting in neogov just to be posted for hiring so that means we've loaded the positions to neogov posted the job descriptions all the parameters for hiring and we just need it to be advertised and those are waiting last month i did have a few that were still waiting for the hiring review committee as of the first we didn't have any as of today we have three pending hiring review committee and as you might remember this means that there is a committee at sit at the city management side that determines whether or not a position is needed and then to release it from posting so as of today we have three waiting on hiring committee looking forward our staffing specialist position has been loaded to neogov that means we've posted it um the acm has approved it for release we're ready to go but it hasn't been posted for advertising yet so it's one of those positions that is waiting on the neogov posting right now we're focusing on our staffing just while we're complying with the covid policies and regulations and what i mean is that we still have to have consideration of that extraordinary fmla or extraordinary expanded sick leave as well as quarantine leave and those other covert related leaves in addition to that we are still looking at trying to give those 70 employees or so time off between now and december 31st i still owe you an overtime report and i apologize for that however i can tell you with certainty our overtime is definitely impacted this morning talking to our deputy directors every one of our lines of business reported back that all their employees are working overtime and that is again going back to the vacancies and then having to allow more time off related to either covid or using down the annual leave before the end of the calendar year um i do owe you longevity and retiree analysis i can tell you i won't be able to get you that until we have a staffing specialist in place and then the temporary staff analysis we've been talking about that because as an organization and with the board we set the goal to eliminate as many temporary positions as possible and convert those into permanent positions within our budget however as i mentioned earlier i'm currently advising the deputies to load up on temporary staff even if it's only for the next four to six months just so we can relieve our members and try to catch up on putting people on the ground when it comes to the vacancies the intern and journeyman program i still anticipate that projection started in 2021 again that's assuming we get a staffing specialist before 2021. so those are the goals moving forward with hr do you have any other questions regarding our our hr activities okay questions all right um clearly we still have a lot of work to do with the city on this uh go ahead thank you sir i'll move into the covet incident management for lcu we continue to operate under our submitted continuity of operations plan as i've mentioned several times all programs are 100 operational and the utility has remained 100 operational throughout the entire pandemic again that means we've got overtime and we've really been working our employees hard while complying with our covert related leave as well as federally required fmla leave our return to work plan is in effect under phase one and i i didn't change the slide i have it through 831 2020 but the governor did redo her order and it's in effect until september 18th i will be rewriting this return to work plan and submitting it to the acm into the cm's office the reason being the governor hasn't clearly moved from a phase one to a phase two as originally outlined in their their state reopening plan instead it's been a hybrid meaning that uh church capacities restaurant capacities school return plans those are all coming out at different levels and not clearly into the phase two reopening plan of the state so i'm going to rewrite our return to work plan sometime this week or next week to reflect those hybrid changes rather than the clear delineation between phase one and phase two so that will be changing a little bit our goal of course is to get as many people back to city facilities and not necessarily working remotely but we want to do so that in a way that is safe and healthy for all our staff right now uh we we're still limited to the 10 the 10 individuals gathering our common areas are closed but as i mentioned i will be rewriting that to match the state's current hybrid situation between phase one and phase two reopening we continue our weekly situational reports to the board and i can tell you our pp has been rap is adequate and we're doing a great job i'll give a shout out to gary byram and his warehouse staff and to dominique rodriguez they've done a great job keeping us well stocked with ppe we are i can say we are one of the few departments who didn't really experience a shortage to this whole thing as a matter of fact i remember dr garcia working with transit to get them some of our masks as they were still scrambling to get orders filled when stock stocks and supplies were low on the staffing side we're complying with all federal acts we are averaging about two associates a week out uh for one of these covid related leads we have been working with staff as lcps students remain virtual students for the first nine weeks of school my understanding is hopefully k through five will return to school after the first nine weeks the city of las cruces has created a really great program through the parks and recreation department which we've shared with our employees so they have um teen learning sites as well as the youngster learning sites the k through 5 students that they're making available at creation facilities and that is a free service they're offering so kids can attend their online zoom classes in lcps while having facilitators available to help with tutoring so it's a tutoring session where they can actually attend their their online courses with an adult or with a tutor helping them out so that's that's been a really great benefit and we have shared that with all our employees i believe the registration deadline is today or at 5 30 today any coveted positive cases are quarantined pursuant to nmed regulations as well as state orders we are continuing our increased sanitization of the common areas and eli duran and his staff have done a great job we've got several uh temporary staff members who are doing that i don't anticipate we'll be changing that anytime soon i'd imagine we're going to have that increased sanitization well through the winter months the as i mentioned before the excessive paid leave accrual of above 24 hours uh 240 hours will not be expanded and as commissioner uh chairman commissioner johnson and mr chair had had mentioned the city council did approve the five hundred thousand dollars a one-time extraordinary leave payment there is no policy yet the only thing the council approved at this point was transferring from the telstra fund into the city's general and operational funds to make those payments but how that payment will happen or what pay codes will be used or what mythology or what amount is not yet fully established it's only the estimates i believe during the council meeting they mentioned about 800 employees would qualify under the standards presented to the council so but there is no policy yet and um we are included with that group do i have any questions on our cobit response has there been any uh employees hospitalized from covered 19. commissioner sorg mr chairman no we have not all the employees that we've had test positive and it's only i i would say less than five that we've had in the entire utility test positive they've all been asymptomatic and really weren't experiencing any symptoms or illnesses okay thank you okay thank you go ahead all right next on our report is the water litigation and as you know um with the texas v new mexico lawsuit and update jay will be here next month to give you an update of what's happening in that litigation during our closed session our federal litigation on griggs walnut we did receive our payment the 6.2 million from the guard and we've issued out our 1.2 million payment to the epa and in actuality i'm going to turn over and defer this to adrian widdenberg give you a better update of where we are on our litigation water litigation mr chairman commissioners thank you adrian whitmer deputy director for water we're very excited because the consent decree was signed july 30th 2020 so we no longer have litigation with the federal government we do however have some additional cases going forward um in regards to some other plaintiffs that we believe that need to be pitching in we have completed some additional mediation so we're really happy about that so right now with briggs walnut it is now just a project that we're going to go in there and continue to do the work and we'll do our annual reports and make sure that it is functioning as as was designed and expected and we hope here in about a decade that we are going to be done with greg's walnut uh i think it's really an exciting time for greg's walnut and if you have any questions let me know christians okay seeing none go ahead all right uh mr chairman our our next item is regarding a donation from johnson controls inc and um we actually have dominique rodriguez online she's our raid and economic analyst manager as well as mr harry romine with jci so dominique i'll turn that over to you or joe dominique i'm not sure what happened to dominique but i can certainly sit sit in chairman commissioners jose provencio deputy director of business services these are items that were donated by jci that have use within our system and uh the details here i i believe uh were going to be discussed uh by dominic but uh if there's any other additional items uh these are the specific points that or or items that were that were donated by jci to utilities detail is presented here on slide 18 so the information here is pretty much uh items that are that have use or or potential more likely use in our system we uh uh fairly uh acquired these or these were donated at a salvage cost and i believe uh we have potential for saving money and uh and get use out of these items into our system stand by for any questions you may have okay do we have to do something as a board mr chair commissioners really it's just an acknowledgement of the donation we've already gone through the the acceptance process meaning that we've remitted all proper paperwork to the city manager's office and that has been approved and turned back down into us i do want to expand the fact and so you're simply just acknowledging that the donations happening i i do want to emphasize that we are purchasing these excess items at uh salvage value not at fair market value so it is quite a discount compared to what a fair market value would be related to these items in addition to that we will have the opportunity once the donation is complete we will reach out to other departments within the city of las cruces on who could use the boxes also we've got some boxes as well some larger boxes that can be used by parks and rec and public works and the utility itself okay thank you go go forward okay uh mr chair commissioners next we'll do our september projects update and for that i'll introduce mr carl clark carl thank you chairman commissioners carl clark deputy director environmental and technical support here to give you the september 2020 projects update the three projects that i selected are the pre-1965 foothills landfill excavation the talavera low pressure gas distribution network phase 3 and the stern drive water line project next slide please so the first project the pre-1965 foothills landfill excavation project there are several contracts here that are part of this project uh that we had to bring together in order to move forward with this waste excavation site uh the list of the contracts are right there in front of you the total combined contract cost is 1.3 million the contract time is 227 work days for this project with a start date of march 18 2020 estimated construction completion date of february 26th as you're well aware i've been telling you about this project uh monthly uh we've pushed this out and the reason being is because we've had to move into screening the material uh with what we call a flip screen in order to remove a lot of the sand material so we don't deliver sand to the quarter leaked landfill and deliver actual waste i enclosed a couple of photos there uh the very right lower right photo is the area number two that's actually screen material there so we have quite a bit of the uh the waste material that gets all the way that's hauled away every friday about at least i think about 10 up to 10 trucks can end up moving that material out of there so we do have a reduction in number of truck hauls that we're doing out there because we are screening the material at this time so percent complete is 50 in regards to construction and 43 in regards to payment uh we basically hauled approximately 23 six hundred eight tons of this waste material over to the correlitos landfill um any questions i did include waste area number two there that's the current waste area we're in we completed waste area number three already uh so they're about 50 through the actual waste area with about 20 of the waste already screened so uh once completed in waste area two move on to waste area number one that would be our final waste area for this uh cleanup effort any questions any questions if if none i'd like to move on to the next slide please the next project is the taliban low pressure gas distribution network phase 3a so this is entirely a low pressure uh gas system insulation in talavera this is the the main installations for talavera which i would consider to be north of soledad canyon the contractor's mythical construction contract cost is approximately 3 million contract time is 200 working days start date was august 10 2020 with an estimated completion of may 28th there are two percent regards to construction uh completed i guess and then uh in payment zero we haven't had the payout just yet or the monthly uh uh pay request meeting a breakdown of this project is there's approximately sixty one thousand linear fee to two inch p gas line that's going to be installed at fourteen thousand lineal feet of four inch pe gas line uh along with the furnace's pipe biting etc uh currently they've uh installed approximately four thousand lineal feet of the four inch uh pe gas line as a week and a half ago almost majority of that's installed in dripping springs road or right off the north side of dripping springs road and then now the contractor has moved into desert mirage north which is north of drifting springs where they're installing four inch big gas line a couple photos there the upper right photo is the back filling with the bedding material on the pipe itself you can see that and then uh the lower right photo is installation of eight inch reamer on the boring head for installation of the six-inch casing so we are having to bore uh several areas particularly across the roadways uh because they're heavily traveled and the county has has asked that we not cut the pavement that we bore under the payment so we we've accommodated that any questions in regards to this project okay if none i can move to the next one the final one go ahead please this is kind of an overall picture uh that it showed of the area that we're actually working in i'm sorry i didn't go into that photo i should there you go dripping springs area you can see the project area it's a large section that's what i would consider north soledad canyon road if they went completely east and west and so it takes uh care of the subdivisions under this phase next next slide some days it works well and some days it doesn't there we go stern drive water line project uh this is a contract with j29 enterprises or a local contractor for 116 000 contract time is 45 working days with an estimated completion date actually we started august 24th an estimated completion date of october 27 2020. they're approximately two percent complete in regards to construction there's not been a pay request meeting yet so we have nothing in there for payments at this time basically they're installing 570 lino feet of 10 inch pvc c900 and then 158 lineal feet of 10 inch ductile iron water line that's attached to the bridge decking their office stern drive it's an nmdot bridge along with the airvac valves and oppertnesses basically they've begun installing the support channels on the bottom side of the bridge decking and uh in order to mount the hangers off of the uh the support channels they've already cleared and grabbed the alignment and began working in the dirt side of that project so i included the upper right photo is the clearing cleaning and grabbing of the area and then uh the lower right photo is the channel on the bridge that's being installed any questions thank you uh commissioner sorg yes thank you mr chair um carl are any of these buried pipelines having uh uh additional pipe for pulling through um future um utilities such as fiber optics uh chairman commissioners uh sorg no uh there's not a shadow conduit there associated with these these pipelines here that was something we looked at in the talabara area we had a our consultant look at that possibility of pulling a shadow conduit for fiber optic in the future that's back in the in the taliban area unfortunately uh it was uh by the consultant it was deemed that it wouldn't be really it'd be very risky to spend our money in that aspect because uh there's already fiber optic out that way and it's a limited on the development size so they felt that we wouldn't see the payback uh if we installed the shadow conduit uh to talavara area now this other pipeline is is a little smaller and and uh it's more of a uh it is in the city limits however uh it has minimal uh residents in that area off the d.o.t right away and um i believe there's recently just last year they installed new fiber optic with one of the uh communication companies along that that corridor already okay yeah okay but you recall uh this was a practice where pract were useful or practical uh in the past couple of years we started doing uh you just still consider that for any of these underground projects not for the stern drive one um no but i mean others others uh any long extensions uh which we haven't run into just yet uh we have not considered that uh because most of most of our extensions uh are outside city limits uh and so uh we're and so the density is a little uh it's much less dense in those areas um but we can consider we can consider for now on looking at that aspect and see if that's a possibility and see if there's any payback for it sure sure thank you [Music] okay go ahead okay mr chairman commissioners uh that's it for our updates on our projects as you know we've already approved two of our resolutions with the agenda which we're on consent our next is going to be our resolutions for discussion and we'll start with uh we'll start again with carl on the well water well 40. okay but first i get to okay the first resolution is resolution 20 21 0 24 a resolution awarding a contract for project number 2021 024 drilling and development replacement waterwell 40 to kp ventures well drilling and pump company llc of cottonwood arizona for a total award amount of 1 million dollars and 89 cents move to approve so amu thank you commissioner johnson in a second thank you uh discussion thank you chairman commissioners carl clark deputy director of environmental technical support this is one of the projects that we that my group led out basically we worked with john schumacher and associates to put together the contracts for this project for the uh redrilling of as well we only had two bidders um they were both from out of state and the low bidder uh skp ventures as you mentioned uh we are going with the base bid plus uh alternate number two which alternate number two is utilizing stainless steel piping uh for the entire well um we felt that for the additional cost it is a good investment because of the longevity of life that we get out of a stainless steel well um i included a couple of photos to show you where well 40 is at well 40 is up on the east mesa you can see how it is in relation to a royal road there's highway 70 on that left side photo hangar lake road uh that kind of gives you an indication of where that well site is it's an existing well site we're replacing the well that failed a couple years ago you on the right photo there you can see the proposed location of the new well site that's pretty typical like you had seen when we redrilled uh wells 2931 and 32 with that the state legislative funds that we received so it's a similar project we believe that uh this is the price that uh we were expecting somewhere in that area so we'd like to move forward with this project okay comments or questions uh commissioner carmichael carl uh i'm really glad to see the recommendation of using the stainless steel casing uh how many wells do we have with stainless steel so far gosh chairman commissioners i don't have the answer in regards to how many we have so far i know that the last uh three wells i did they are stainless steel which are the 29 31 um maybe if adrian whitmer still online she could tell us but i know that this is something that we've moved forward and uh just recently um i'm not sure how far back they started that because a lot of our older wells are all mild steel which you get so many years out of them i don't believe as many as you would get out of a stainless steel casing so right so we're recommending that going going forward hopefully yes sir that's how we when we spend this kind of money we want to make sure we get a long life out of them good the other question i had was on the vendor doing the drilling uh great references that they had in their bid all their drilling or at least in their references appear to be in arizona maybe one in texas somewhere are they likely to get any surprises when they come into new mexico uh chairman commissioners i i don't think so this is uh a pretty common work we will have you'll see on the next resolution where we'll have john schumer associates on board with us for the drilling of these wells we follow pretty much a standard methodology and so they should be prepared and ready to come in and and uh meet our specifications as identified in our contract documents so we we we spent a lot of money to make sure those contracts uh are spot on thank you you're welcome uh commissioner hardy uh i just wanna comment i thought that was a very good suggestion going to stainless steel so good idea thank you thank you anything else ready for a vote commissioner archuleta hi mr ben cuomo yes commissioner carmichael yes commissioner hardy yes commissioner johnson i and commissioner sorg yes and the chair yes thank you all thank you the next resolution is resolution 2021 lcu 007 a resolution awarding a construction oversight contract to john shoemaker and associates inc of albuquerque new mexico for the drilling and developing replacement water well 40 project number 2021 o24 for a total contract amount of 99 483 dollars and 94 cents thank you and a second thank you uh discussion thank you chairman commissioners uh so this project here or this contract goes hand in hand with the previous project i just discussed um we have john shoemaker and associates getting on board with us uh as part of the uh oversight of this contract um they have the experts that they'll send over the hydrogeologists that will remain in the field during the well drilling process as you can see the scope will work there it's eight to ten hours a day during well driller mobilization drilling and final site work uh full-time oversight during well completion this is important critical at this time development and pump testing so they'll be there as the muds get prepared ensure that everything meets the requirements uh they'll ensure that the well hole is is drilled straight they'll stay on top of the contractor 24 7 as they're drilling along and uh pulling mud samples and uh they'll get some of the screenings they'll also develop us a nice chart of all the uh the profile uh of the uh media or the strata that's in place that the well is going to go into uh in the end we'll get a nice report summarizing all the work that was performed uh as well as the interpretation of the test pumping data so we can although provides recommendations for maximum pumping rates at those and the pump setting levels uh for this well so we we like to have them on board they are the experts they drill i'm sure they have well over 100 wells under their belts over there john showmakers and associates okay thank you uh commissioner hardy if this were the vote uh no did you not have your hand up no let me see if i can get it down if i did did someone have their hand up and i just couldn't see it i did i'm trying to oh commissioner johnson okay now sorry yes and this is just a more of a clarification we used uh shoemaker and associates to evaluate the previous contract that was left let and now we're using them to monitor that contract and this just has kind of a little bit of an appearance of conflict of interest i assume this is all in in in line with our procurement policies and so on from the city but i wasn't familiar enough to to decide that um chair commissioner uh delilah walsh interim director this is typical of most projects um i'll use it as for example if we were to build a building typically we'd have an architect create the plans manage the bid and then actually assign a project manager for the construction of that building so it's very similar in this situation wherein john shoemaker and associates helped us prepare the bid documents would uh we would evaluate the bid under procurement and then help us execute that bid just like you would a building okay thank you okay anything else seeing nothing ready for a bit of sorry a vote uh vice chair archuleta i commissioner ben cuomo yes mr carmichael yes commissioner hardy yes commissioner johnson aye commissioner sorg yes and the chair yes thank you thank you okay that concludes the resolutions for today a considerably shorter list than last month the next item is old business commissioner on old business first of all i do want to confirm we are have requested a one and a half hour closed session prior to our regular meeting in october so it'll be a closed work session of the lcu board for an update on the texas venue colorado litigation okay thank you and uh that will be calendared for us yes sir yes sir and that will happen with our october meeting next on the uh updates of old business uh we have been working with mr carroll with whom you had a uh public at the last commission meeting and i will actually turn that over to clark uh carl has developed a good scoping report we're working with uh mr carroll and carl if you wouldn't mind giving us a brief update yes thank you chairman commissioner carl clark uh deputy director environmental technical support so you all heard from a letter that was uh read by the uh board chair last month from mr carroll so i have intervened with mr carroll and and uh i had the uh uh i've been able to meet with him in the field talk about his issues and uh see how we can work with him to correct these issues and so uh we are working on setting up an easement for the force mains that we have along motel actually it's the the branch that goes into his property so he wanted to ensure that we had a clear demarcation of where las cruces utility ends and private property begins and we can do that we'll also be installing a couple of valves and a couple of check valves in order to protect the private property owners from our system when it's pressurized and ensuring that we can never push into their private their private system so i've met with him he's uh he's been he was actually part of our scope and report we included all of his comments uh we all agree that it's the right direction to go in and we anticipate getting completed uh by about november 10th we just completed some potholing to verify sizes and location of the existing horsemaid and we're working on a design to pass to either to staff to go out there and work on or we'll hire a contractor to come and install these valves okay thank you so we will look forward to a mission accomplished next time yes sir thank you mr chair um in our also on old business we will be i'm very excited to share that in october jeff dillard will be giving you a demonstration of utility hawk and as you know this is going to be the software we're using for the customers to access their water usage data or actually not just water but all their usage data within the utility online so customers can identify their own usages and i'll actually turn it over to jeff dillard the demonstration will be scheduled for next month at our board meeting but jeff can give you a briefing of where we are chairman commissioners thank you jeff dillard business systems analyst as ms walsh said i wanted to bring you a quick update on the utility hoc customer portal this is part of the johnson controls jci performance savings contract we've been working on this for a while the board initially approved this and then we came to the board again to select the final candidate which was utility hawk their portal will allow our customers to review their water and gas consumption check an estimated bill based on the usage in the billing cycle and set threshold alerts which are automatic notices that are generated by dollar limits or usage limits custom set by each individual on the account this portal be available on any device phone tablet or computer staff has been working for quite a while with utility hawk to set up the data exchange between our munis billing system the itron advanced metering infrastructure system and the utility hawk portal we've been testing and verifying these processes every step of the way and in the october meeting i'll have that demonstration for you to show you what our customers will have access to once the system is live and available to them thank you thank you anything else mr chair that's all we have for old business okay now new business for new business um we are actually going to be converting to the icompass agenda management software and i will turn that over to almonds you can give you a better explanation of what's coming oma you're muted we're gonna we're gonna do a quick social distancing flip so alma's gonna come into my office and i'll get six feet away from her deal okay elmer ruiz senior office manager for the record and the city council started using icompass which is a cloud-based program that enables the creation of the resolutions agendas and agenda packets to be electronically saved to the cloud they started using this in february of this year and they've suggested that the lcu board be the next board to come on live using this program and this is going to really benefit us because of the resolution approval process it's going to speed up that process in order for us to get it from beginning to end a lot quicker and therefore having the agenda packet being able to be sent out as a complete packet and that is really everything that another key component is that all of the documentation that is uploaded to icompass is searchable it is searchable now the way we send it because we have to do an extra step in the process of doing optimal character recognition which is ocr every document so that's also going to save staff some time in utilizing this eye compass and we our target is to start this process for the november board meeting giving us a month to kind of get some tests and some training in for staff that utilize this so we hope that it'll be a smooth transition for the board members when they receive their agenda packets bye stem for any questions okay um questions uh mama this is ed does this involve basically electronic signatures or what thank you um chairman commissioner archuleta it's actually it does it's a workflow electronic workflow that provides um the approval process okay thank you sure any other comments or questions okay well we will look forward then to november do we get a dry run ahead of time or we just plunge into the deep end commissioner sorry we switched back uh desks to lyla walsh here um we'll probably just uh dive right in but aml and her staff will keep you up to date on what you need to do or getting access to your documents well ahead of time and as she mentioned we do have the benefit that we'll be able to get these packets out quicker through the signature process so hopefully we'll have some time to play with it with you all right thank you uh any other new business yes sir i'm very very honored and pleased to announce and i'm sure you've heard our city council has recently approved the naming of our new water quality lab to the jorge a garcia water quality lab so we're it's obviously a very well deserved honor and we're excited to do that with and for dr garcia and with the city council um they had a great resolution based on your own proclamation that we we gave dr garcia upon his retirement so carl is actually working with the original contractor and architect so we'll order that lettering make sure everything's consistent with the new building as well as the building design what we're planning to do is carl's going to coordinate getting those letters onto the building and alma will coordinate with the city manager's office staff so we can get a very nice resolution printed on the parchment paper and presented in the certificate framing just as we did for his proclamation and hopefully we can have an unveiling once that's all complete and invite dr garcia back so we can call we we're calling it our jag lab now so it's the j-a-g lab and uh once we do that we plan to do something where we can unveil the new name with the board and with dr garcia with the council okay thank you anything else that is it for new business all right next item is boards general discussion i have some items but is anyone else okay seeing none once again the board welcomes mr peely as the new city manager we are looking forward to meeting with him and talking about the utilities department and uh mr pealey do you have anything additional to add at this point not really mr chair commissioners thank you thank you uh for your warm welcome i i am looking forward to a tour i've already talked to uh walsh uh about taking a tour to the facilities you know i i have uh i've had the opportunity to manage a gas and electric along with our water and sewer companies uh my previous employment and so i have a special place for uh for utilities and i understand how uh how much work goes into it and and you you mentioned something mr chair uh being an invisible part of the part of the city nobody really gives the kudos because they don't all they care about is their toilets being uh their lights turning on and they're you know their heat in their homes uh but but we got uh very much unsung heroes in in this department and and uh those who manage that so i appreciate the opportunity and i certainly look forward to to the tour and and getting to learn more about our our facilities great thank you again all right um this is a warning shot um the october meeting will include appointment of a chair and a vice chair uh in the intervening weeks think about whether you are ready to serve in the capacity of either chair or vice chair and we will proceed with the appointment at the at the october meeting the second item is the uh next work session on the 10-year water plan if we wait until a board meeting to have another work session it will be november at best and rather than wait that long i would like to suggest having a standalone work session toward the end of october i'd like to have you look at your calendars for the last two weeks in october and email alma with your availability during those two weeks we'll probably spend uh start about 1 or 1 30 and spend a couple of hours uh uh delilah you will be or alma will be checking with the um city schedule because this will need to be um broadcast and so we'll have to work in our our broadcast with the other uh city events and once alma tells us what days are jointly available we'll pick one and go forward from there are we in general amenable to meeting at some time there in the end of october uh commissioner johnson yeah i certainly am i did have one question i assume this will still be a zoom meeting and not a in person we believe so it would take a major thought in the resolve of the state we're limited to 10 people yeah i i think it might take divine intervention to be able to do it in person meeting by that time yeah and if we if we tried to meet in person we could have the seven board members but then we could only have two or three staff members and uh so chances are it's going to be zoom okay thank you mr chair this is count commissioner sword it's possible i might not be available at the end of october okay well uh we will miss you uh mr hardy i should be available almost any time in there okay go ahead and let alma know i will and by the end of next week alma will have a read on what days are available and she can share those with us mr chair if i may delilah walsh here if we could look at those last two weeks of october maybe the first week of november just to give everybody enough of a a plan and leeway as we'll have to also work with our consultant as well as with city management on the broadcast so and just let us know your let alma know your availability and we'll get we'll find the best date for everyone good enough anything else i will entertain a motion to adjourn second carmichael thank you those in favor all say aye hi thank you all we'll see you in november thank you october october you're right you're quite right never mind you gentlemen thank you