[Music] so [Music] good afternoon mayor we are live okay good afternoon everybody welcome to the work session of las cruces city council today is monday october 12 2020 it's approximately 1 p.m before we begin if you please just join me in the pledge of allegiance please pledge allegiance to the flag of the united states of america and to the republic for which it stands one nation under god indivisible with liberty and justice for all and now we're going to have our pet of the week and i guess uh jennifer martinez you're doing double duty you're going to introduce our pet of the week and in in two respects so i'm helping to open the meeting today but also i would like to let you know that we are going to have two pets of the week from now on because we are going to do one cat and one dog so good afternoon mayor and council i am jennifer martinez with the city's communications office and today i'd like for you to meet two furry friends um first we will have figaro figueroa is a laid back cat who loves peace tranquility and lounging he is an introvert but he once he warms up to you he will love you like you have never been loved before he invites you to bond with him at the animal service center over a glass of milk then we have calibri a two-year-old girl who just loves the outdoors and staying active she's always on the move and loves being around others giving attention and spreading joy and giving kisses you can meet both of these animals at the animal service center of the messiah valley the hours of operation are monday through friday noon to 6 p.m and on saturday and sunday noon to 5 pm you will of course still need to make an appointment you can call the number 3820018 there on the bottom of your screen right now the off-site adoption events are still canceled until further notice but if you are interested in adopting you can go to the website ascmb.org adoptions the cost is 25 and you will look for an app number and then call to make an appointment to see the animal that you've chosen again that same number is three eight two zero zero one eight a reminder about pet licensing pets in las cruces must be registered and licensed and you can also do so through the animal service center of the sea valley but they are temporarily suspending the in-person license sales so keep that phone number handy if you're interested three eight two zero zero one eight and you can arrange to have the license mailed to you the fee structure goes as follows if you have an altered pet that cost is seven dollars per year an unaltered pet the cost is fifty dollars per year and if you're an older las crucin a senior citizen the cost is only five dollars per year but you do need to show proof with a valid photo id and each week the communications office reminds you of what we are doing to respond to the covid pandemic that's going on and so we do have another mask up las cruces event which is coordinated by the quality of life department and then also um they've already done a couple and so now we're going to have another one along the way and there will be another couple more coming up so right now we have one for wednesday october 14th that's from five to seven pm at the field of dreams parking lot that's 2300 to shiro drive you will of course enter from teshiro and then this time is something a little bit different you will also have the opportunity to have a free covet test and if you're interested in that you do need to wear a mask when you drive up so um it's encouraged to wear a mask regardless but um if you are interested it's again october 14th wednesday from 5 to 7 p.m at the field of dreams and again there will be additional mask up events that are coming in the future so we'll give you more details on those as we get closer to those dates thank you mayor have a great afternoon thank you jennifer okay ann now we go to jobs of the week and arlene lopez will make that presentation thank you mayor good afternoon members of the council this is darlene lopez one stop operator for the workforce connection offices in southwest new mexico so the jobs of the week are a gas measurement tech for the city of las cruces that's one position and that's open until 11 4 of 2020 the next one is refrigeration technician for stampede meets there's one position open until filled and then we have a registered nurse for tresco there's one position that's open until filled direct support staff or caregiver for lessons of life llc and that's open until filled and then we have one buncher and one multi-wire operator for cn wire and that's open until filled and we also will be having a virtual job fair for cnyer on october 29 2020 and we'll be working with the city to uh promote that and and working together to get um get the information out to the public for more information on a full list of jobs and other opportunities you can go to employanem.com or government jobs dot com forward slash careers forward slash las cruces okay thank you darlene thank you all right now we're going to go ahead and go get on with the agenda there's three items on the agenda the first one being a proposal of amendments regarding the lease of mmc or memorial medical center and i believe mr bill hamm will be introducing our presenter bill are you there everybody see me yes all right good afternoon mayor council uh bill hamm economic development department uh today yes we are here to talk uh about uh some proposed amendments to the memorial medical center lease memorial medical is being represented by chief executive officer mr john harris and chief financial officer mr steve steve weingartz and they will be here to present the proposals and details for certain amendments to the lease for council's information so with that i will turn it over to mr harris harris and mr weingarten gentlemen thank you bill well i don't see john harris i see janice jones his executive assistant john is on that table they're muted oh they are oh i can't unmute him so annette can you unmute or barbara and mute those gentlemen please or david darling mr mayor it's going to be have to be adrian um they haven't made us co-hosts yet uh let me see oh i don't even know what agent was there david you are co-host and so is barbara let me see i'm you so they gotta they'll get a prompt on mute now on their end so we could just prompt it we can't actually unmute for them well let's see here there mr mayor i'm i'm texting janice jones to see if she could step in there i was going to do that but thank you uh can i suggest that the table i don't know if well no it's not a phone in never mind uh can you hear us yes all right okay uh that was steve weingart i'm john harris mayor thank you and city council thank you so much uh for having us participate in your meeting today i'm actually going to have steve weingarten my cfo make the presentation so steve i'll hand over the microphone to you are you able to see the presentation not yet maybe we need to be able to release the or let you share the screen i will try to share this my screen on my side well let's get with one of the hosts and see if they can yeah they're they're allowed to i'm sorry if someone else spoke oh i'm sorry mayor uh yes they have they have the permissions to share their screen okay are you able to see the presentation now uh no sir all right we're having they can't see our presentation okay can we take a look we're on the live mine yeah sure and this is barbara deleon can i bring it up on my end and share my screen this is a nat and i believe the problem is is that you're logged on to your um on the conference computer and he's trying to share the screen from his personal um computer so it's not going to work oh we want to have you log on to the laptop i believe what we're trying to do are you remoting into your desktop interest oh this is it this is not my laptop no right so um if you'd like we can we can share the screen over here and then you just provide the narrative would that be okay that works for me okay barbara if you want to go ahead and put that up that'd be great i'm bringing it up can you see it yes i'm trying to get a sense of what they've got things here is is this where f3 comes into play it's f5 right so you're just going to narrow it down yeah okay yeah but i need to get rid of all that there you go good yep i'm good gentlemen can you see the screen yeah so this is yours they need to see him though he just took it off john or or steve can you see the screen we're working at it well i i think we've got it up i think we've got it up now if you'd like you can we can you just provide the narrative all right all right you won't be able to necessarily see us but we can see you yeah we can see you guys here yeah we can see all right all right i'm on the i'm on the title screen there's a proposed lease amendment moving to slide one so in terms of existing lease and thank you ladies and gentlemen for allowing us to present this afternoon this is a proposed lease to the um amend our amendment to the proposed lease that we have with the city and the county of las cruces for the facility the existing the existing lease is was executed in may 19 2004 the 40-year lease and we are 16 years into that lease to date the terms of the existing lease require four percent of net revenue is a capital investment and there are other terms of the lease as well but the two major components of that is the calculation of the four percent of net revenue is based on a rolling three-year average and capital investment is to be used for facility improvements and equipment what we are proposing as a lease amendment is that the capital investment would move from four to 3 of hospital operations the capital investment is measured on a cumulative life today to the lease and we would eliminate the calculation of the rolling three-year average for capital investment we'd also propose that we put some definitions into the lease amendment that capital investment would include all additions to the fixed asset accounts in the current fiscal year and life today to the least that we would add a component for any major repairs that are under 25 000 involving renovations or upgrades to the facility that do not meet the capitalization policy and for the first 12 months of a newly recruited position those costs would be included in the definition of the capital investment as well as investments that we would make an electronic health record for new applications interfaces or significant upgrades that do not meet the capitalization policy we would also propose to put in reporting requirements where we would submit annual updates to the city council and county commissioners to report status of the capital investments for the fiscal year and life to date of the lease and those update reports would be due by april 30th of each year for the previous fiscal year and the likes to date of the lease some discussions around our proposed amendment reducing it from four percent to three percent is more in line with the national norm or the capital expenditures for the hospital i'm sorry if you want to advance the slide some more one more another one there there i'm sorry back up all right i'll do a better job of telling you when to flip lifepoint is committed to continuing maintaining the facility and invest in new technology and equipment for the community health care needs the capital investments from 2004 to 2019 included large projects related to facility renovation and expansion which includes the main entrance an icu and ccu our emergency department the med surg wing a cancer center central sterile and mri but we may see less of those big projects like that going forward capital investment to be measured on a cumulative basis for the life to date of the lease next slide we would eliminate the rolling three-year average calculation because it really doesn't consider that projects may expand multiple years and it actually requires less of a capital investment to define the capital investment to include all additions to the fixed assets the major repairs under 25 000 the first 12 months of a new physician cost for any provider that we bring into the community in expansion of the electronic health record and also would have the specific reporting requirements to the city and the county on an annual basis of a report due by april 30th and a cumulative capital investment like today the least measured against a three percent capital investment requirement next slide this is a look back at the life to date of the lease today of the capital investment history that has been made from 2004 to 2019 the total capital investment has been 127 million 235 thousand dollars the capital investment requirement at the four percent level was 124 million 592 117 the average capital investment per year that was required i actually done was 8 million 482 the average capital investment required per year was 8 million 306. i will take a pause there and answer any questions from the mayor or the city council members thank you very much for that uh steve looks like counselor sorg has a question in counselor vasquez um but before i get to them let me um let me just ask you something real quick so i i know that this was uh based on four percent of net revenue have you provided your gross revenues to the city or county so that we can verify that that a percent or that amount that you've invested is is on task we can certainly do that this is all based upon our financial records of the net revenue for those years from 2004 to 2019 when we we've also already done the presentation to the county commissioners and jumping ahead a little bit assuming that the council members and the mayor you're you're agreeable to at least having more discussions about this it was decided at that meeting that we could establish a work group where we would review in more detail the history of what's happened on the lease to date which is when i could provide that financial information and we could discuss the talking points that we've described here in more detail but yes i can provide that information and and i'm i'm just kind of uh getting a few things uh brought to that level of discussion so that my colleagues can be a little bit uh familiar with this because this i don't to my knowledge not even counselor sword was on was on council when when this lease was negotiated i was a city council for district six back then let me ask you one other thing when right now do you have a wing for mental uh mental patients people with mental yes sir we have a we have a 12 bed psych adult psych unit we do not treat child or adolescent and geriatric uh patients are normally sent to another facility that we have transfer type agreements with and also what services were provided back in o4 that are not being provided now if any to my knowledge no services have been eliminated over the years if anything we've added to the service line okay and you can get a you can get a um some type of uh verification on that uh as well as as well as the employees how about that has it been a decrease increase or has it stayed the same since 2004 um no sir i would i would venture to say i've only been here for two years but i would venture to say that we've increased the ftes significantly our total ft count is up over 1400 now okay and then the last thing before i turn it over the eight million dollars that you gave the city in the county of which we received four four million of each you had that for approximately how many years before it was turned over to us i don't know the exact term of how long it had been held in escrow but i know since my tenure here when i arrived in late 2018 that was on a task list for john and i to have resolved and we were able to accomplish that john do you remember how many years you've had it you know um i have no idea how many years they had it i would what i recall is what steve just said and that was that we were tasked to hand it over the concern at the time was the liability that we would have in the conditions in which it was handed over and so once those once the attorneys agreed to that we were able to hand over the funds it was actually clear and by the way i want to go back to what steve said earlier in the eight years of my tenure as the ceo we have eliminated none of the services that were here uh and we have expanded services significantly which has required us to significantly expand the number of ftes in other words employees we now have for example 16 clinics with about 80 doctors that are employed and we were nowhere close to that when when i took over here plus we've added a picu pediatric intensive care unit we've expanded pediatrics in in many ways and a variety of other services uh and recruited in numerous doctors including specialties that were not represented in the region before so uh thank you for that john so i actually met with you when you first when you when you first came on board almost eight years ago about this eight million dollars it was owed to us my question is where was it sitting it had already been been cleared by the way it actually been there 10 uh 10 years you've had it um after 10 years it was clear two years we've been waiting for it and then we finally got it just a little while ago actually it's been over almost eight or nine years i just want to know uh two things one where was it kept and the interest that was accrued for all those years i don't think it was given to the city or county we'd have to look that up that that was handled by our attorneys so we'd have to look up the details of that okay okay so uh with that i'll go to counselor serge vasquez and flores council resort thank you mr mayor i just have one uh simple question um concerning the uh percentage of capital investment uh that three or four percent um is that re read as at least three or four percent or up to three or four percent or right exactly at three or four percent it's right at four percent we're taking it as four percent now and we're proposing it three percent okay so you actually have spent more than four percent in the past how many years now the history um so it's not it's these it must be at least four percent instead of uh exactly at four percent then right our capital spending is not necessarily totally limited by that four percent that we're required to do we are basing our span based on what the needs of the facility are and and how we can best utilize those dollars that we have available to us for capital investments um some years we may spend more than the uh required amount of 8.3 million in other years we may spend less okay now that's what i thought at least four percent you want to change it to at least three percent now okay we'd like to calculate it based on a cumulative life today to the least which takes into account projects that may span several years okay thank you very much mr harris thank you mayor welcome thank you thank you mayor um thank you to our guests uh first i have a question uh perhaps for you mayor or for other members of our staff here the reason behind putting this capital investment clause in the lease was that to ensure that the city has a viable facility should lifepoint choose to cease operations there or was that to make sure that we had a a well-refurbished um upgraded uh facility medical facility while lifepoint is there what's the original reason for having that in there i'll let the mmc discuss and then i'll i'll come back oh okay thank you we know that without capital investment and we can't continue the growth that we've experienced in our net revenue over these many years and it is our goal and desire to want to be not just the hospital for the community of las cruces and the county of donata but also we are expanding our reach into the what we call our secondary market areas which includes giving silver city truth or consequences alamogordo and south going into el paso where we have clinics as well so we're bringing in patients from all those different areas which are seeking health care here and are spending those dollars in this community while they're here so the investments that we're making in capital are based on what we believe are the key strategic needs for the community in order to continue to provide the kind of health care services of a regional health care system but i think another important point of this is creating the flexibility in the capital investment because we on our own motivation have have really worked not only to expand the services of this facility from a community hospital is steve just mentioned to a regional major regional referral center for southern new mexico so to do that we we've had to diversify services not only in the breadth but also in the depth of the services and then beyond that everything is not bricks and mortar there are years where the focus is on bricks and mortar as as a greater percentage other times it can be software applications the addition the recruitment of doctors on average that's about a half a million dollar million dollars per physician we recruit a lot of doctors here set them up in practice uh and a number of other things in other words it's not just bricks and mortar it's also other other things that we have to invest in in addition to that the the tower itself is 50 years old approximately so there are a number of things that are being done to maintain that facility and the the age of the facility is one of the reasons why we we asked for the requirement for the repairs and maintenance under 25 000. anything under 25 000 is considered to be non-capital for us and we count that as a repair and maintenance but what we've done is very strategically gone on to different units and we may renovate a part of a unit this year under that 25 000 limit and the next year we may expand that and that renovation may be something simple as just a fresh coat of paint and new flooring and maybe doors and windows and things like that but we want to make sure that we're trying to keep the whole appearance of the hospital as fresh and new looking as possible you know i'll mention to the city council and to you mayor that we are one of the leading hospitals in the state of new mexico in terms of quality and safety in the accolades that we have won we've had near perfect joint commission surveys that are done every three years if you do well on them we are the only late prague a hospital in all of southern new mexico and one of two in the entire state we have certifications and accreditations in all of our major programs from bariatrics to cancer care we're the only accredited very uh cancer care program uh not only in southern new mexico but uh there isn't even one in in el paso so we have decided to uh our calling card at memorial medical center will be on quality and on safety of care for our doctors their patients and for our employees and the accolades we've earned reflect that okay so thank you for that uh john so so councilor vasquez uh if i recall the reason why um the city and county put that requirement the four percent improvement per year is i'll give you an example so let's just say you took a let's say you own a 200 000 building whether it's a commercial building well let's just say commercial because commercials usually is uh worn a little bit tougher than residential so so four percent of that would be 8 000 and that money could be you put aside or be used for say a roof um electrical repair plumbing repair uh equipment in this case equipment so remember this is not just in adding on to the hospital which they've done in the early years but it's also any equipment that they purchase and so i think the city county felt that four percent was a was a decent amount to make sure that not only was the hospital staying with the with the most up-to-date equipment but also for possible expansion because it was a very difficult time to let go of the city county owned hospital we still own it of course but we lease it so i guess if you think of it as a kind of like a triple net lease we're requiring them to to fix the hospital add to it and and and basically keep it functional until the time that lease expires or we decide to move in a different direction yeah no that explains it really well mayor and that's that's what i was i think trying to get at in terms of you know we're protecting the city's asset in addition to also ensuring that mmc has the dollars to keep to keep the facility up to date and certainly with all the uh improvements and technology and accolades that you've received for your service um i think both of those are important but i did just want to make sure that that was one of the original negotiation points in the terms of the lease was to protect the city asset in addition to the obviously having a well-run up-to-date hospital um so thank you for that um i have a question here about the uh the investment and expansion of health record technology um i think that's a term that you want to modify to allow this um i guess what you're proposing which would be now three percent of all capital investment to go towards the expansion of health record technology um and and going back to that conversation mayor so this is not necessarily a fixed asset this would be something that that life point i'm assuming would take with them um or that is proprietary to to life point in license to life point um so since we're moving um or or since mmc would like to move away from some of the brick and mortar and move into um you know some of the and i'll throw in there the physician pay as well i think the cost for recruiting a physician in the first year um i just a little bit more explanation on those since i think those really move outside of the capital investment realm in the traditional sense um if you could just talk a little bit more about those two needs yeah i did you know we recruit a lot of doctors annually and most of the doctors can't survive in southern new mexico unless we recruit employ and and put them into practice so a number that i would tell you on average is about a half a million dollars some of them are even more than that when we recruit them so that's one and when you look at plumbing repairs electrical repairs under the current definition i don't believe those even fall under capital investment as we have it certainly software applications like electronic medical records uh when you when you invest in those those are in the millions of dollars as are many of the other applications that we have and use not only in the hospital but also in our physician employment component so it it part of this this whole argument or not argument the discussion is about being able to be flexible and nimble in the market for use of capital on average hospitals across the united states in bricks and mortar are going to invest two two and a half percent in bricks and mortar they will invest more than that perhaps on average when you start accounting for all of these repairs this year over the last 12 months alone we have had to put a quarter of a million dollars into uh repair of pipes in in the institution because they have aged out they have a 50-year life and after a period of time because of the what they're they're made of they they have to be replaced and that list goes on and on uh elevators that are here today that were put in in the 70s there's about a four or five million dollar cost of replacing those um it won't be long before we get into steve listed on the uh the slides that were sent to you we're going to uh replace all of the operating rooms ultimately will replace the emergency room and so on so it's it's a capital intensive industry but the definition that was included in the original document between us the asset purchase agreement didn't go far enough in qualifying or defining what these kinds of expenditures would be and giving a growth oriented administration like this one is and that means growth not only in the facility but also many of the other components that it takes to really grow a community hospital into a major regional referral center that just didn't it didn't uh anticipate those kinds of expenditures we are no longer going to operate as we're really transitioning memorial medical center into memorial health an integrated health care system that serves all of southern new mexico that encompasses not only the needs of las cruces but gemini silver city alamogordo truth or consequences and beyond thank you so much a follow-up question on that is if if mmc if if you guys have currently spent more i guess on average than four percent of the capital investment that's required in the lease per year on the current items that are defined within the lease uh wouldn't just adding wouldn't diversifying what you can spend that money increase your capital investment needs um because it seems to me like reducing it to three percent and then diversifying it on what you can what you can spend capital investment on would really just be an increase in costs and we'd be decreasing the percentage and again i don't think that we focus necessarily on the fact that we only have to do a four percent investment in the facility today our capital um strategic plan that we develop every year and we we have a like a five-year rolling plan for capital so that we know what's coming at us in terms of the end of life on certain pieces of equipment or facility upgrades that we want to do and renovations that need to occur over that time period and we keep updating that every year so we have that on our radar as to what's coming before us for the future in terms of capital but we don't look at it every year and say well we only have to spend four percent so that's all we're going to spend this year we base it on what we believe is necessary in order to meet the strategic plan that we have designed that is centered around how do we make sure that the community has the health care system that it needs i hope that answers your question and yes by definition if we if we include those other things then we're going to be able to demonstrate that yes we've made more of an investment but again i don't think that we're going to necessarily slack off or back off of what we want to do in terms of continuing to to grow the facility and be able to offer the kind of services that this community deserves i don't i don't base the strategy of this hospital and working with steve and other officers of the hospital on that percentage at all like bases on the community needs and the the opportunity that we see uh in this area to to grow i i you know our feeling is is that we're more comfortable given the dynamics of the marketplace in healthcare in the state of new mexico uh as uh and i'm the chairman of the board for all the hospitals in the state of new mexico as i am the chairman elect for the medical school here we're more comfortable at the 3 range but certainly equally important is expanding the definition of capital investment because like i said earlier it's not always going to be about bricks and mortar i have a similar uncleanliness on the appearance of this facility both inside and out excuse me you excuse me john you're kind of can you move closer to the microphone please you're yeah i'm also um i'm the i'm a stickler not only on uh on the uh on the cleanliness of the facility inside and out but also very much involved in development of services for this region and to do that you need we need more flexibility i believe in terms of how we how we define capital investment because like i said it's going to be bricks and mortar some years but other years it's going to be other other priorities recruitment of doctors putting them into practice the related losses and you'll you will lose money on every doctor that you put into practice or annual loss on with doctors is 10 million over 10 million dollars a year in terms of managing these practices but you wouldn't have doctors in southern mexico if you didn't have someone doing that and other times it's software applications for electronic medical records and so on so both components are really very important thank you i really appreciate that answer and and let me also just say i really appreciate all the mmc and really the health as you mentioned the health network that you're building does for our community here in our region um so let me just say that i guess i'm just trying to figure out if uh looks like he's spending more than the four percent we're adding new yes and we're adding new investments um you know just how how that ultimately shakes out with even a reduced capital investment uh percentage that you're proposing it seems that maybe if we reduce to three percent then you have one percent more of operational budget that could go toward health record technology and physician recruitment and it wouldn't even need to go under necessarily a capital investment since you'll you'll have that additional money in your budget unless it has something to do with with how you how you budget each year i think also it has more to do with yeah i'm sorry i think it has more to do with getting the definition into an amended lease agreement and we can work out those details as to as to the dollar amount um that for instance if the city in the county said to us we'll accept the new definitions but we want to put a cap on what you can include as far as that four percent or that three percent goes um so that you can include everything so that they're still you're still asking us to make a commitment in true um equipment and building improvements as well as potentially new new buildings i think there could be a mix in there okay um thank you i i appreciate that and i i would just need to learn so much more i think to i and you know better you run the you run the health system you're in the hospital but these are just uh good good um starter questions just for me to understand this a little bit more so i appreciate it um what would you say is the pro the primary impetus for for changing this capital investment uh clause in this lease is it is it's a more competitive you recruit physicians is it to be able to diversify the type of expenses that you have that are not fixed assets in a changing kind of medical healthcare world um is it to allow some of those small repairs that you mentioned that are not covered for under 25 000 a mix of all of those what's that what's the it it thank you for the question it really is a mix of all of them and i think versatility is is right in there but you know three percent is more competitive with what is being done nationally but i one thing i can tell you is that we're not going to take our foot off the gas pedal of developing memorial medical center into a major regional referral center and that includes refurbishing the patient tower in addition to we we also have created a wound care center in the past it's free standing we've maintained the health flex we've set up an ent office a freestanding office and i could go on and on and uh it really is just giving us more flexibility in how we channel capital towards the goals of this institution let me also help put that into perspective in a different way we have a vested interest in making sure that we can continue to grow the net revenue which requires the type of capital investments that we've made in the past which has gotten us from point a to point b here today where we've seen significant growth in the overall operations of the hospital but if we were to try to replace this facility today at 200 beds at an at a national average cost of 1.6 million dollars per bed we would be looking at anywhere from 350 to 400 million dollars to try to replace this facility so it is in a in our better interest to try to maintain the facility the best extent we possibly can even given the fact that the building building is now approaching 50 years old we've got to do what we can every single day and since facilities reports to me some mornings i wake up with news that we've that we have a chiller that that's on on its last leg and we're going to try to repair it one more time and we've got elevators that need to be replaced and and we've got end of life equipment that is happening and everything everything we're doing in healthcare lately seems to be expensive in terms of capital so to john's point doing all of this just allows us that diversification of how we can allocate dollars on a year-to-day basis but also report to the city and the county on an annualized basis of what's happening to their facility thank you and when you don't i think you mentioned that there's been years where you haven't spent the full four percent on capital investment and others where you've spent more if you don't spend the four percent on capital investment annually is that does that remaining whatever's left in that percentage fund does that roll over to the next year's um capital investment fund or where what happens to that money if it doesn't get spent all the way up to that percentage point we look at it on a cumulative life today to the lease and we and we're measuring it and that was that's what i'm proposing that we put into the lease amendment is that we look at it on a commit cumulative life today to the lease to see how in those years where we maybe spent less dollars it was because in a previous year for instance we might have spent 11 million dollars on a new part of the building and we had less of a need in the following years for certain things but then the next year or the year following after that year where we didn't necessarily invest we might have gone over so it really again we don't look at the four percent in in isolation and just say oh that's all we got to do this year so that's all we're going to do we look at it as what is it going to take in order to make sure that this operation stays very viable and it is a place where people in this community truly want to seek health care i guarantee you if there are a lot of facilities that aren't maintaining their facilities and the people in those communities go i don't want to go to that hospital because i don't feel like it's safe i don't feel like it's clean i don't feel like it's nice and they don't have the services that i need and when healthcare dollars begin to leave a community other dollars tend to track with them as well and we want to make sure that we're attracting people to this community from those outlying secondary market areas in particular and we have really grown that volume this past year thank you and one last question for me before handing it off to my colleagues here uh if the if the term on the lease was changed to three percent for capital investment um that additional one percent uh about a quarter of the capital investment which i think is about two two million two and a half million dollars maybe per year uh what would mmc would do with that additional revenue if it's not considered revenue we pay for the capital out of our net out of our net revenue and out of our earnings for sure but it wouldn't necessarily mean that we would set it aside into a fund or anything else again we're going to look at our strategic mission and decide where our capital spend needs to be for the next year or for the next five years following that okay so it'd be part of you budgeted into your overall non-capital investment budget since you'd have that money essentially not um tangled up in this clause so i guess i was just wondering is there a specific need for that two and a half million you've identified or so that you'd be getting back that you don't have to spend on capital investments if we lowered to three percent no okay thank you mayor thank you those are my questions for now thank you councillor flores thank you mr mayor i um and thank you gentlemen for your presentation and thank you uh dear colleagues for your excellent questions it uh demystified uh some of the questions or to an extent some of the questions i have but um i think i have to say preliminarily uh the mayor asked a question about what what happened to the money that wasn't paid when it should have been paid to the city as the least you as a lessee we as a the city as the lusore um and you weren't able to answer it mr uh weight uh you indicated that you'd have to have your attorneys look at this and that that to me um is troubling and also in light of the fact that you're asking uh for a modification at least that would benefit and be more money for you to carry out uh services to the community that i just have to say preliminarily is troubling to me i think that before i would in any way vote to um to agree to your um provisions in the lease your clauses and lease i would need to see that information um and you also stress that you are very much wanting to spread services um and you keep emphasizing that it's capital improvements at the same time you're saying that you're extending services but by extending services you're necessarily even if you're moving away from the brick and mortar you're going to have um expenses that are capital improvements and then um so so my my concern here is that um there is knowledge here that um the um the city excuse me the the hospital makes referrals and um and i think that there was there may have been some expenditures expenditures in connection with a facility called turning point and um that facility has been known to be very anti-abortion and and it doesn't matter what my standards this has nothing to do with how i feel about abortion uh pro con you know whatever in between it's not that's not the issue the issue here is that if if if the if mmc is in fact um facilitating or in any way uh referring or facilitating or funding that facility i i don't want to be a part of it and in the event that turning point is being supported i i'd like to see what sort of referrals you're making because if you're saying that it's for the purpose of helping the community and spreading services all over the community all over southern new mexico it seems i think that we should know exactly what facilities you're funding and what sort of services are being extended to our community and and i do not fully understand why you want to reduce the four percent to three percent um and again if we can't have an if we can't have a clear explanation of where all how that money was spent in years that we weren't paid um i i have to tell you preliminarily um this doesn't sound very good to me thank you gentlemen thank you mr mayor thank you john stark um before i get to mayor pro tem let me just just share for the rest of the council basically and this is just off memory recall how the breakdown went let's just say it was around 70 million 40 million went to the city and county and that's i guess you could equate it to a million dollars a year 20 million went to what they call ibnr incurred but not reported so these were claims that this is where that 8 million came from these were claims that weren't reported but we knew throughout the years was going to happen and i believe they maybe spent around 12 million of the 20 and that's where their 8 million refund came and then there was about another 10 million set aside for the employees give or take it may that may be kind of high because see the city the the mmc employees before we moved over to this lease they were quasi governmental and they actually got the same similar benefits that city and county employees got and so we made sure that they were left whole you know because imagine if they had 18 years in or 17 years in and then we lease it that was unfair for them and so that this money was meant to make them whole so that they would wouldn't lose on their retirement so that's how that that that chunk came out it was about 10 years ago because remember it been 16 years so after that first six years or so uh the lawyers felt that it was done they had approved they go ahead and release the money and eight years later is when we got it and so i was looking for was the interest that where that eight million stayed for for eight years and then second keep in mind if you're not comfortable because i'm not comfortable renew looking at this lease we used some um a consulting firm from back east who was an expert in this and that's how we came up with this and so my suggestion if we move forward and it's okay to move forward you know we're going to try to be helpful here but but i i think we can also make sure that we hire someone who's used to doing this hospital leases so they can go through and take a look and make sure that what we're doing is is is is good uh mayor mayor pro-tem gandra thank you mayor um thank you gentlemen for your presentation i very much appreciate um the service that you um provide to our community um and and so i'm sorry can you hear me mayor yes so we can hear you okay um i i'd like to um request a couple of things and this is more more to staff mayor i think we need to have a history again like you said none of us were on council but you and um it is unfair to ask specifically to you know all the things that are being asked without having a history so i would like staff to come up with a powerpoint presentation and that would give us the history or some narrative i think that is really important now i realize that we've probably have lost a lot of institutional knowledge um with retiring and having you know mr garza leave who probably was responsible for some of this maybe not i don't i don't know but um i think a history is helpful i want to see i would like to see the lease um um gentlemen i would like to see the number of capital projects that you have done and it's cost specifically to that main building you have indicated that capital improvements and or building of other buildings and the perimeter right up in that in your property i don't believe is included in what you're required to do within the four percent correct we count it as everything related to memorial medical center the operation of memorial medical center okay so not just the building the the main building correct because the property around us is all part of the memorial medical center okay all right thank you for answering that i really appreciate that i i was not um aware and bear with me and the rest of us we have like new council here and i this is some of the first times that this has come to our attention um so um i i so you talked about this five-year strategic plan specific to capital capital improvements would that be something that you'd be willing to share with us in terms of seeing what your vision is and uh what's necessary for improvement yeah forward yeah we can we can share highlights of that plan for sure because it's fairly comprehensive sure i understand we have a capital outlay um plan here and it's um very complicated right so i i can appreciate that understand that so i for me i just feel like i need more information um rather than less um the other thing is i i have appreciated again like i said what you've been what you have been what you mean to our community um and this idea of assisting and recruiting physicians at least the first year salary i would definitely agree to i think that is very important um gentlemen i don't know if you're aware but i have formed a group it's called resilience leaders and it's how we um working with trauma right children and families that have trauma that goes undetected and untreated and about a um two years ago i had reached out to counselor ekman to assist me in um recruiting some folks from mmc and the other hospitals to sit on this specific group to fast forward to about a year ago we did we actually implemented a survey disseminated that survey we received a little less than 1200 respondents and in in that in the information that we that we received around medical care i'm i'm deeply concerned about and some of that is about what you're talking about right um um recruiting and retaining physicians um making sure that our physicians stay here stay here for longer periods of time having a wait period for specialty um physicians it was enormous and i'm happy to share that information because i think it could definitely play a pivotal role in what you already know but it's something that um this group that we've done that we have come together once a month um to speak to these to these issues around access so i definitely would be in agreement to paying for or or changing the the the requirements to fit you know that need i think that is something that we we certainly need to um to think about um especially when we had dr bayatas do the presentation and what we've like we've agreed i think as council is to focus our attention on our healthcare industry right how do we bring um quality um folks into the medical field and that includes the hospital i took a lot of notes let's see let me move through that yeah um as far as um the electronic record can you talk to me a little more about what that would entail this is anything that we don't include as part of our capitalization policy which is anything greater than 25 000 is normally capitalized but for instance to do an interface between our chr and a referring provider especially like out in the outlying areas where we're trying to draw those patients into this community to continue to help support the organization and also meet their health care needs that interface could be anywhere from 10 to thousand dollars it allows us to exchange back and forth the information about that patient that we're going to treat and also it allows easier access for that referring physician to not have to be here on site to find out what's going on with this patient he may refer that patient to one of our hospitalist groups or to another specialist here in town and that specialist will take care of them admit the patient discharge them but that a lot will allow that referring position in that other community and it's not just limited to the outlying areas because we also do that with our own internal position groups that we have where they can look at the record as appropriate under all the guidelines to see what's going on yes okay so this would be um so um one of the other conversations that is is happening in our community and i'm sure that you're aware especially around our behavioral health providers is this idea of a universal um electronic right um platform that um the the all of us in our in our community could share um and i i man if you i if you could help us do that um it's not only for from the from the behavioral health sector but the medical doctor um having this universal electronic um record i think would be so helpful um again following the guidelines as you have you said mr weingart but um it i think if if you are um interested in those discussions i think that that would be something i could get on board with for sure um lastly um can you tell me what um the roles and responsibilities as mayor indicated i guess we own the facility we lease it out to you so what are the responsibility as far as um the city in terms of of um i guess facility understanding what is going on in our own facility in terms of like do we get to go in there and inspect that building or what i don't know what the guidelines suggest i think anytime that any of the mayor or any of the council members would like to have a tour of the hospital and to get an update as to what's going on especially some of the project work that we've done over the years john and i both would welcome that opportunity to have you visit with us um we might even be able to make that happen under all these covet guidelines that we've got going on right now even though we're not doing the visit or piece of it but um uh but yes you're welcome to come in and take a look at the facility and see what's going on i think that would be ideal well actually you know to give you more specificity about that we've had an open board meeting every year since the inception of the asset purchase agreement the you have both the city manager and the county manager that sit on the board of trustees of this hospital and have attended the meetings regularly they also participate in what we call executive patient safety rounds that are conducted throughout the institution so while they may not take a tour uh every board meeting of the hospital or for that matter the the free standing facilities that we have they're traveling around through the hallways of the hospital from time to time at the board meetings prior to covet 19 happening and seeing what the facility looks like but to arrest maybe some of your fears about that i've dealt with the joint commission over the four and a half decades that i've been running acute medical surgical hospitals and when the joint commission comes in they have in both cases in the three-year surveys that have been done they have said are compliments to this administration for the way that you have maintained an older facility in extremely clean conditions and they've seen what that does what that translates into surgical infection rates which are very low how we deal with septicemia and c-diff and other other major patient harms that are tracked nationally and we have participated in a program historically with duke healthcare system that has made us one of the leading large complex hospitals within life point in terms of the results that we have achieved in such a short period of time so you have a lot as a city in the county uh i think to be proud of in this institution i will also tell you to your point that you brought up about providing providers to this community to come in many forms but uh to the extent that we're we could talk about physicians we have an end to one of the oldest independent residency programs in family practice in the state of new mexico and over 70 percent of those providers when they matriculate from this program stay in the state of new mexico to practice so we also have a very strong affiliation as i mentioned earlier i'm the chairman elect of the medical school board as i am the chairman of all the hospitals in the state of new mexico and we work hand in glove with the the medical school specifically for their medical students to shadow our phys our medical staff uh as we have our uh residents in our own independent residency program shadowing our positions so we work daily to keep uh providers in new mexico here and that includes nurse practitioners and other advanced trained personnel like physician assistants we also provide substantial scholarships for local residents so that they can attend uh nursing school whether it be at nmsu or the community college or elsewhere within the state thank you mr really it i i am proud of what you've you've been able to accomplish here i don't think there is a fear from my from my end other than i i again please understand i feel like a bit behind the eight well i don't have a lot of information about what the lease says and maybe i i'm so we have a facilities um department right so for each of our facilities that we have situations like this that we lease out i want to know what is our role in responsibility ensuring that the maintenance is keeping you know that we are we are um um we are meeting um the needs of that particular lease i i just i've not seen it so i don't know and that was really my question um i've been in your facility a few times i have been at your yearly function i was there last year right before covet hit um and i was really excited about um the the points that you made and the improvements that you wanted to see happen moving forward um and so again i i appreciate that i i will if you'd like um i'd like to share um this survey that we worked with new mexico state universities um [Music] i always forget their names but i'm sorry it's the center for community analysis at new mexico state university that helped with the survey so i i'd be happy if i don't want to flood your emails because i know you probably get a tremendous amount of email but it's a good report and and something that that i think we need to refer to and really consider as many folks who answered that felt like you know waiting lists are too long especially around specialty care um you know the quality of care um it is sometimes a concern and i'm not saying that specific to mmc i know that accolades um and i know of i have family members that have um been in your hospital and have been very pleased with your service so um for me it was more about what is our role as a city in terms of that facility or do we have any i don't know because i haven't seen the lease that's my question and maybe it's more for staff well you know what i would suggest is that regardless of defining that role from the city or for that matter of the county we're an open book we're very transparent about what we've done and what we what we plan to do as we've tried to be in this conversation and let me also add that the study that you performed uh we we do a lot of work with new mexico state university uh with john uh dan arizuman and john flores uh i serve on the medical school board with both of those gentlemen have great deal respect for them and what they're doing and we would love to see the results of your survey and if there's something that we can do to work with you to better this community and the surrounding area we'd love to see what we can do with that so maybe we can do a sidebar to meet with you individually to talk about that survey and what we can do together sure thank you so much i appreciate i appreciate that and i am i would be open to a working group i think that is an important next step with the county and or a joint meeting with the county so that we can really um you know dig into what it is that what our vision is for really um that facility moving forward and health care so thank you thank you thank you mayor pro tem and i'll share something with you all after counselor ben cuomo and then um see what you all think about that councilman cuomo thank you mayor um and thanks to my colleagues for the wonderful questions and before i jump in here i just want to say you know thank you to mmc for the way you've stepped up for a community during this pandemic i think it's been you know important that i say that and in addition to you know having this vision to provide medical services toward you know across the borderlands which is something that's really important and necessary and so let me just say thank you to that um i also i'm you know as a new counselor i'm also feeling like i am missing a whole lot of historical context and then um you know in order to to make a decision in any way shape or form and so i would absolutely be open to you know i was sitting here thinking like wow how silly i should have asked for this information before today things happen how they happen you know but i'm obviously not the only one so if i would have asked for something individually from staff when clearly perhaps this information should be shared with all of us i think that's really critical in addition to i would like to um mayor second sort of what you were talking about in terms of bringing in an external entity that could review some of this and and help us make that decision um you know on one hand i really i think i understand that um the need to be competitive right come you know and and remain competitive in this market and ensure and frankly that really leads to better quality of care for for um patients so i think ultimately at the end of the day that's a good thing um i just would like to know the you know um the longer term consequences or outcomes of a decision like this um to be honest with you i think probably most of my questions um would be would be more internal anyway um the one thing i do want to ask for there's a couple things i want to ask for sure but one for staff or you mayor is you know you know we have this telstra fund that is my understanding comes from the lease of of the hospital property would that be impacted by a decision like this four to three percent it not at all no no they paid us up front that's where the 40 million came from and and i think it was based on basically a million a year for 40 years and that's where we came 40 million we split at 20 and 20. said he got 20 county got 20. okay i don't know unless john and steve are trying to want some of that money back i don't know if i heard that part no no okay thank you mayor right that's just sort of for my understanding as well um and then for you gentlemen i guess you know one of my biggest questions is how how has kova 19 and the pandemic really impacted you on the business end how has it impacted you in terms of the you know your capital improvement plan um it's been a tough year so i'm curious to hear from you on that well it's it's it's affected us adversely in a very significant way we have uh we're a hub hospital for southern new mexico i should say we're the hospital for southwestern uh new mexico and much of southeastern many of the cases that they've incurred are transferred here certainly deming silver city truth or consequences alamogordo and sometimes beyond when you shut down elective surgery uh as one of the key cash flow uh pipelines of a hospital and in addition to maintaining much of the operating expenses you're gonna do damage financially to an institution but we are recovering and we have put a greater priority on acting responsibly for the people of southern new mexico than anything else making sure that we have enough personal protection equipment for our doctors and for our uh our employees and to keep the patients safe and to keep each other safe we have cooperated properly at a very high level with the governor with the uh the secretary of health uh and and others uh i've done that both from a statewide basis as well as a local basis on behalf of memorial medical center and certainly everyone around me has done that but yeah we're trying like every other acute medical surgical hospital in the state to recover financially uh from what we've gone through and we still continue to go through it but we're recovering i don't want to i don't want to overstate that or understate it we're realistic and we're very can do oriented people and we're going to continue on our journey to make this a major regional referral center for this part of the country yeah great thanks so much um you're welcome i really don't have much else mayor like i said i feel like i'm just like i'm missing a ton of truthful information but you know for me at the end of the day i think whatever looking at all this from multiple angles will be important and making sure that at the center of whatever we decide is community and and the health of our community so um that's certainly how i plan to make this decision but would love to hear from um definitely our partners at the county and then like you said mayor um an external expert well i think thank you counselor i think matt holt is still around and he was the his law firm and he himself were the was a main facilitator of this and so we may be able to i think he teaches at the university but we may be able to bring him back and and see some things but let me just let me just ask some questions of you john and steve so the let me ask you have are there any models hospitals that actually have a maybe more than a wing but basically a facility for behavioral health mental health um even if it's similar to a state run is that is that any model that you're aware of anything like that exists in addition i'm not sure i'm not sure i understand your question i think you're speaking to the under bedding of behavioral health in the region but you're asking if there are acute med surg hospitals that have wings dedicated to behavioral health right i mean a large a larger one i mean like uh you you have what eight beds maybe at your place no we have uh 12 that are dedicated to that and we refurbished that unit let's say think about a year and a half ago yeah let's say like a 30 bed facility is that something there that you've you've seen any models that have you know something that's fairly large because i think the facility in las vegas is how many bed oh i've never seen that facility i don't know uh i could find that out for you mayor but do you do you are you aware of any models that have that large yes in fact i i yes i i there are models where there are hospitals that have entire wings that are dedicated we have an entire wing that's dedicated to behavioral health it just happens to have 12 beds and you know those that's where footage doesn't accommodate just actual patient treatment areas per se it also accommodates offices for providers of behavioral health and that is precisely what we had when i arrived here eight years ago we've maintained that throughout my tenure okay in fact we've improved on okay and i i think you spend on average about eight million dollars a year on per the lease correct give or take yeah okay yeah so and then because it's so antiquated you're probably spending another two million in addition probably uh probably in your utilities i mean to keep it cool to keep it warm to keep it hot yeah you know i would think so we spend a quarter of a million dollars a month may or just some electricity yeah i figured it i i guess they made it two million so okay that's more so this is my this is my thought process here and if you had a new hospital a brand new hospital i think uh like say a 400 million dollar hospital would you be okay with your with your current commitment at four percent for the first couple of years of a new hospital you you usually don't have to spend those kinds of dollars but over time and probably that time is about five years into the life of a new hospital you begin to see a couple of things one is you want to expand services so you need more capital dollars for that you gotta you gotta buy equipment that you maybe didn't contemplate when you built the facility the first time so you've got to invest in that um i wasn't expecting that kind of answer but but let me just tell you where i'm going all right the council has this uh as do i a wish to be able to have another facility here in southern new mexico for those who need uh mental health behavioral health and i just you know right now money is very inexpensive we can borrow at one percent and so i i ran a number a 550 million dollar facility would cost 1.8 million a month debt service you guys are used to paying about eight to ten million a year if you could continue paying what you're doing and and the state can kick in 10 million and then this is the thing move it to the and we'd have to annex it but move it to across the street to the university and work on arrangement with burrell so it'd be almost like a facility university um and then and then we could have that built sitting county still to own it and then we'll uh we'll deal with the old hospital later and then basically you'd be spending about what you're spending now we we of course wouldn't be spending anything we'll just we'll just be the fiscal agent and whatever and then and then um the hospital pays us uh 10 million a year or so to to for the debt service and then we just and and then maybe you need more to run the to staff it but that way there we get in on a fraction of it as opposed to the 200 million that they'd have to spend to build a hospital down here what i'm trying to get at is an all-in-one university private and this and then also contracting with the state for for mental health is that something you'd even consider instead of uh and then we would just lease it back to you i think that uh maybe in an offline conversation i can explore that more with you but one of the biggest challenges that all providers are facing now with mental health in particular is the lack of reimbursement and support from the various states particularly for the medicaid and for medicare to fund the mental health programs as well as the managed care organizations like the blue crosses united healthcare and those there is a continuum of care that i have a personal belief in for mental health and that is it's not just the inpatient bed that you've got to have you have to have the outpatient resources for those folks to be able to follow up and to continue so that you don't have the risk of readmissions but this is something that can be explored maybe a network session that we would have in a little bit more detail yeah you know if my colleagues are interested uh this way here uh and then of course you know that facility reverts back to us that that where you're at and then we choose to do whatever we do whether we sell it we lease it to another facility um and then whatever income comes in that's ours so i guess what i'm trying to say is we can turn this into a money-making venture for the city and county you guys but then you also get a new hospital and work with the university and and burrell and uh and the state so we can we can we'd be very interested in talking about that we've like i said you know we've um we found dan arvizu and john flores great people to work with and gary carruthers before them uh and dan howard the the uh we've tried to maintain a very close partnership with new mexico state university and certainly with burrell since inception and frankly others uh mayor we'd we'd be delighted to get together with you and talk about it further in a work group beyond what we're talking about today wouldn't that help with recruitment of doctors as well if they had a place that they could almost even do their residency at unquestionably and it would complement everything up to this point that that we've done i mean i i we have recruited in outstanding positions in almost every major specialty uh that require an additional capital intensity but everyone loves to work in a beautiful hospital there's no question about it i you know i really think there's enormous potential for this hospital and like i said i've only worked in it for eight years but i'm very business development oriented very quality oriented uh as is the team i have a highly experienced team with steve and karen iverson who's uh karen's the you know you have the president you have the chairman of the board of all the hospitals in the state and you have the president of all the nurses in the state in this one hospital and uh which is highly unusual if i had a hospital that looked like the quality of care that takes place within it it would be an unmatched strength okay well you know i'm just just trying to take advantage of these low interest rates one percent is incredible what we're used to paying is five and if we if we were back in those days um the debt service would be a million dollars more a month that's 12 million more a year and and i based this out over 30 years that's 360 million dollars more so i guess what i'm trying to get at is if we can work on something it might be really beneficial for all involved yeah yeah i agree um did counselor florida and mayor pro tem gander did you have your hands up or did you forget to put them down sorry mayor okay no problem sorry um so okay so um let's get with our colleagues at the county and see what how they want to move in this direction whether they want to i don't even know what what took place from their meeting or if you want to give us a recap but i really think that one we ought to take a look at hiring an outsider to take a look at the lease or and or when you have if you want to have that discussion um about this uh maybe a newer facility like i said across the street we're gonna have to bring in the university to lease us that land we'd like to of course have it annexed so that we can get the gross receipts tax into the city uh let's still be owned by the cap by the university that's fine 99-year lease and off we go there i would propose that a select group of individuals from the city uh the county is already amenable to doing this as well they're going to have a select group of individuals selected to come together as a joint working group to go through the more details of the lease amendment and propose something back to the full city council and the full county commissioner group on the results of those negotiations and with the outside consultant involved as well uh i think they were going to talk about bringing in the attorney for the county to be as part of that work group so and john and i are available to work with those individuals on an as needed basis to come up to the final terms and conditions of any proposed lease amendment um i don't know if uh uh dave if any of our staff have have a copy of the lease i know i've got it somewhere i have some here and there you know i kept it i knew it would someday be important to keep but if you happen to have it it wouldn't it'd be nice to at least send some of that information to the caller excuse me it's barbara deleon yes um staff uh in land management have actually been gathering that documentation back to the mmc lease we have a voluminous amount of documentation related to it okay um and just for the for my colleagues basically what was happening reason why we leased it is because it was getting to the point where it was really hard to run as a as a a one-man show i mean the economies of scale was such that when you partner with a larger facility and and and john i'm sorry you guys work for who now what's the name of the company life point but that's not my point health that's not the original one that we leased it to was it you i believe you originally leased it to province and prominence was acquired by lifepoint okay that's how i knew it had changed uh and so we knew that by going with a larger facility economies and scales would be such that that would make it more viable because if we didn't do what we did you were going to see us probably having the county was probably both we're going to have to raise taxes to continue to offset the losses that we were experiencing that's why we did it we didn't want to do it but we we were faced with either keep raising taxes or work in arrangement and that's how we came up with this lease and it was a big deal well you're exactly you're exactly right mayor that's that is true to make your point even more specific the there are three out of the four hospitals that surround us that are in various uh states of bankruptcy or near bankruptcy the only financially viable hospital independently owned of the four is alamogordo a quorum that manages and owns and manages deming is in chapter 11 silver city has now been reduced from a 70 bed hospital to a critical access they had significant problems at tvc and allen bordeaux as i said remains viable these hospitals are very challenging in this day and age to keep financially viable and but most important to offer high quality safe uh care to the citizens and that's really what we've been about here is is uh achieving high quality safe care and keeping this in a financially viable way this hospital received the highest award out of 88 hospitals in all of life point health for its its ability to work with quality and safety working with his employees working with the community maintaining his financial viability and so on we received the top award in the entire company for that and you earn that it's not given to you so we're proud of our record but we know we have a lot more to do for the people of southern new mexico well i think that speaks volumes for the management team such as yourself and your team so congratulations thank you okay so i guess then we'll go ahead and come up with um come up with a committee to work with our colleagues there at the county um we'll look at getting that information on the lease to to my colleagues and then we'll set up another time to discuss um we're going to probably going to have to bring in the university and burrell see if what would and the state really i mean to see if they're even amenable but i don't see why they wouldn't be but i think this would be the this would be ideal would you say mayor protem if we could do that oh yes mayor i know that i've been having detailed conversations with the governor's office and with larry haran our lobbyists since last year as you know it's been part of our we've wanted to see part of our strategic plan for one of our and and so just we i was going to begin really um pushing along and then covet hit and it's just we know i understand a more serious conversation with the governor's office related to that but they were very interested in it and wants to see how how they can how they can help make it happen good okay um again i'm just gonna council flores did you have a question or no i don't okay just just uh all right all right gentlemen um was it david did you say theo did you have something you wanted to say or you just popped on no mayor i i've got the next minute so oh okay all right okay uh mr harris uh mr weingart weingarten is that how you pronounce it yes sir okay okay all right well we appreciate it very much and again and i joined my colleagues and saying thank you for the wonderful job you guys have done there at there at mmc and providing quality health care to our residents here and maintaining the mission that we were we were hoping to maintain and i think you've all have achieved it it was a it was a challenge i i remember i could still remember those meetings and there was a lot of residents that were really concerned why we were doing this but the bottom line we could see the writing on the wall and thank you for sharing those uh those you know those unfortunate situations of our surrounding hospitals but we knew that only one only one way to get out of this is either what we did here or just start raising taxes to pay off that debt okay all right well thank you very much for your time we really appreciate it and appreciate the transparency of the candor and uh we're going to continue to be your partner sir thank you very much we stand ready to help all right well we'll be in touch okay thank you thank you thank you okay so the next item is 3.2 the the geo bond projects overall update mr david sedillo and tony trevino are going to make the presentation well good afternoon mayor and council my name is david savio i'm the interim public works director for the record and i will be going over the presentation this afternoon for the geobond projects uh one thing before we start though just a couple of items to note is this presentation was scheduled to be before council in the work session at the end of march but unfortunately due to covid when the health order hit that did not go through and as as you all know the city got really busy on focusing how we were going to move forward with for our community on addressing the the pandemic so with that i also wanted to let you know is that we will also be coming back to council with quarterly reports throughout the completion of the program itself so with that i'll go ahead and start to share my screen that way we can move on with the presentation thank you okay thank you it was mentioned this is going to be our our geo bond program update so just some history and background based on on the go bond itself is the community voted and passed a go bond back in august 21st of 2018 in the amount of 35.6 million dollars now they approved four total questions uh as part of those questions there are requirements within each for question one we have the park improvements dog parks and sports courts that was a total of 16.9 million that included the items bulleted below which are the hadley avenue reconstruction complex improvements unidad park rehab and new splash pad the sports courts and park rehabilitation two dog parks and the new east mesa public recreation complex question two approved a new animal services center and the amount of 9.8 million question three was the replacement of fire station number three for 6.2 million and the last question number four was the walking jogging biking trail improvements for 2.7 one thing to note again is all of these projects are to be completed by the end of year 2022. so we'll go over a brief recant of the public engagement that happened both pre-election and post-election so as council recalls we hired architectural research consultants to assist in how viable these projects would be for gobond so as part of those efforts back in may there was an address created so people can submit input and that was that via go bond at lost lost-cruises.org between may april and may of 2018 surveys generated 824 responses from from the community arc or architectural research consultants compiled 417 comments from both meetings and a survey now between the dates when we initiated this of february to july 2018 there were six council meetings those included a work session award the contract and to approve the bond questions and also news conference also between february and may of that year in 2018 there were a total of nine public meetings as we moved into the post election portion of it between december 2018 which was after the award in august to september of this year there have been a total of 10 council award meetings between january 2019 to september 2020 there have been a total of six council work sessions now this next item between january 2019 and march 2020 there were a total of 10 public meetings these were actual public meetings where we engaged the public at different sites again this is pre-coveted the next item that you see is april 2020 the september of this year and then at that time we've had a total of 13 public meetings now these were have all been virtual meetings due to covet so some of the accomplishments that we've had obviously is we've hired a program manager under contract in ecm international incorporated council approved this contract back in december 2018 for a total of 1.2 million they are to obviously coordinate the design and construction track invoices and provide updates as part of the program and that's what they were hired to do now we'll go ahead and move on into the bonds uh but before that uh one point that i do want to make or or highlight is that council approved the reimbursement back in december before the contract was approved for ecm to get the process moving forward until we had the chance to sell the bonds and at that point we would once we sold the bonds and got the funding we would able to reimburse them to start the work so the first sale of the go bond which included 18 million dollars or roughly half was sold back in february 12 2019 uh here more recently the second half of those bonds were sold in august for the remaining 17.6 now we'll go and move on into the updates for each project as we go through and you'll notice that they'll go by question question one obviously will have various projects that are associated with it and i'll go through those each one the first one that we have is the hadley reconstruction complex improvements that was a design-build contract and that contract amendment was approved by city council here recently in august 17th since then the pre-construction conference was held september 29th the notice to proceed was issued october 5th now the areas associated with this project and the improvements are as follows we have mag hardy and paws ball fields those improvements all include work to the concession stand restrooms the crow's nest stucco repairs and musko lighting the other field associated with this project is the ron gaia t-ball fields that includes irrigation backflow preventer and musco lighting here's a copy of the project schedule for that if you could see here with that approval the contractor's been going through and getting their permits in place to move forward now another thing that i'd like to point out is this line here or this time frame that you see related to the lighting we'll go over that a little later on as part of the projects as this is one of those items that has pushed this project further out just due to the lead time of this type of material and this is pretty standard across all installations and these types so that muscle lighting there's quite a bit of a lead time before we can when we order the materials to they actually come in now the remaining portion of the schedule you'll see where the contractor has identified where they will be doing those improvements for each of those items at each of those sites moving forward another project in question one is the unidoc park those construction drawings are at 90 complete we did have a second public meeting a virtual meeting that was launched back in june and we also presented this to the parks and rec advisory board and we received approval to move forward with the final master plan or design of that project back in july 16th now this project does have a splash pad with a recirculating system that has been notified to us will be required as part of the water conservation ordinance and we'll touch base on that a little bit later on in the presentation so keep in mind this this portion here uh as you can here's a layout of the projects itself you can see the improvements that go through and this was presented you will see this is the estimated location of the splash pad and the improvements to the park so as part of the replacement of the park we're going to be taking and maintaining that look and feel as all of you know the united park was a huge community endeavor to build a park so we wanted to make sure that the design reflected that in the new construction so as part of that we're going to be replacing all the wood pieces with composite material this will also include so for your viewing is a sample of a splash pad with water features so moving on to the next project we have the sports the parks and sports court's improvements this is also under question number one it is also a design build contract and that contract amendment was approved by city council in august on the 17th that pre-construction conference has been held on october 1st and the notice to proceed was issued october 5th now some of the improvements and locations are going to be listed below so we have some picnic and playground improvements included at desert trails young and apodaca park we have tennis and pickleball court improvements at young apolaka lions and metro verde parks and lastly we have basketball court improvements those are going to be at metro verde four hills cardone benavidez community center frank o'brien papen and klein parks as with the other project here's the contractor's schedule for viewing as noticed and as explained the notice to proceed was issued october 5th and the contractor has actually begun construction on this project which was last monday october 5th when they received that again this schedule here shows the date ranges of when they will be at those dedicated places to perform those improvements next we have the dog parks now if you recall there's going to be two locations of the dog parks one at burn lake and the other one at rinconada adjacent to the animal services center building that we have as well as part of the go bond projects so the dog parks were presented to the parks and rec advisory board and approved to move forward with final design on august 4th the construction drawings are at 100 percent and we are incorporating them into the construction of the animal services center project now again this will we'll discuss this a little bit later on uh ins in some of the schedules that we'll go over so for reference and for everyone's knowledge the placement of the dog park at burn lake is going to be on the east side of the existing soccer fields they will be over to the south to the east a little bit more towards the south uh the lake itself on the campus if you will is on the west and the other thing that i wanted to point out was the existing restrooms that are right here as part of the complex as part of this project this will not have bathrooms installed as there are really bathrooms provided at the complex itself hey efo there's really no water there if you see any it's just a mirage i'll share that with you okay thank you so as part of the amenities that you'll be seeing it at both dog parks both of them are an acre in size they do have separate large and small dog play areas along with entry and exit vegetables for each of those large and small dogs they also have shade structures play equipment drinking fountains landscaping and paving paved parking and sidewalks as seen on the drawing here the information is the same for the dog park over at grinconada as far as presentations to the parks and rec advisory board the completeness of the plans but here if you notice it's adjacent to the new location for the animal service center building this is located off of the but excuse me this is located off the frontage road of baton memorial west at the intersection of grinconada so again it'll be adjacent to this facility here and incorporate it into the construction of this facility this has the same amenities as the location at burn lake with one exception this will have restrooms the reason for that and those restrooms are located here in between to be accessible from each side the reason we're providing restrooms here or these facilities is this is separate from the animal service center there was a lot of questions and concerns when we were going through that public input that said you know well are people just going to be coming over to the animal service center to use the facilities and then we have you know contamination from pets going in and out and so it was decided no that this would have its own facilities for that purpose as we move forward with that and last on question number one is going to be the east mesa public wreck complex now the question and what was approved on the geo bond question was it included only a 10 acre park soccer football multi-use fields a baseball complex and eight pickleball courts now the roadway and utilities were not part of the geobond question however staff has worked to identify funding through separate bonds and other means to have these infrastructure needs completed also as part of the complex during the as we were moving forward we developed a master plan to build out the entire complex with the anticipation of a second geo bond election or question to be voted on by the public again the question in number one did not complete the entire complex and the needs of the community that's why we're moving forward with the master plan perform that during the design and that would allow us to complete that parcel completely so as part of that the designer came forward with public input and we had three different master plans if you recall we had the paseo the greenway and the parque master plans now based on feedback or input from the public the majority of them liked a combination of two of those so the final decision and presentation to council which was awarded on in july 13 was a combination of both the paseo and the greenway master plans and that's what was approved for that area so for phase one currently right now we're working on the construction drawings and those are estimated to be completed here in the first month of the new fiscal year january twenty twenty one again the improvements that are gonna go forward in phase one or what was approved in the question so the soccer multi-use fields we have the baseball complex eight pickleball courts concession restrooms and a 10 acre park again this is phase one out of the develop master plan and this illustrates where those improvements will be as part of phase one of the master plan the next project that we have is question number two this is its own sole item it's the new animal services center again the location will be off of baton memorial west in renconada park here is a layout or an aerial view of what we expect to see with the improvements of the facility now those construction drawings are at 100 percent uh we're preparing the request for proposal to get those out to a construction bid that should be advertised here next month now another thing that i'd like to highlight is as part of the question it was asked to have solar and this was at a couple of facilities but we are looking at and incorporating solar photovoltaic array which should be included with with the project there so here's just an architectural rendition of what the facility will look like the top view that you have would be that front elevation or that front view from the frontage road on bhutan memorial west so that's kind of a depiction of what it should look like the bottom picture is an elevated angled photo of the facility and just trying to give you a layout and a 3d model of what that would look like from a bird's-eye view next we have fire station number three which is part of question number three those construction drawings are at 100 percent bids were received back in august it's gone through the rfp process and at this point right now we're under negotiations with the highest scored contractor again for reference the project will be adjacent to the existing fire station number three this will serve a couple of purposes this will maintain services out of fire station number three while we construct and build the new facility and then once it's built then we'll transfer over again this is off of valley drive next to haner and a jace and sandwich between the brannigan park to the east here's an overview of the site itself again down over here towards the bottom your valley drive so just giving an aerial view and layout of what that should look like from above and here we'll you have some architectural renditions again what that building will look like feel the top one is a view from valley drive again the bottom one is from an elevated perspective looking down so you can see a 3d model in that regard and now question four uh which is the last question that was approved on the bonds this is the walking jogging biking trail this is a design build contract as well and includes improvements to the army collateral the southwest city loop which is part of the messiah drain in the las cruces lateral the construction drawings for this project are at 60 percent and currently ecm is working on a guaranteed maximum price and on those documents to bring them forth to city council now this project although it was presented to the parks and advisory board parks and rec advisory board no action was taken that meeting is scheduled to occur this thursday the 15th that way we could get approval from the board to move forward with final design so here we have a picture of the project schedule and i believe everyone is pretty familiar with this look and feel of a project schedule and if you say hey that looks familiar you are correct this is the project schedule that was presented on the conceptual portion presentation when we first started to move forward with the go bonds so what i'll like to do at this point in time right now if you noticed off to the right or i mean off to the left this is the schedule as of september 23rd in preparation of the meeting over to the right you're going to see a little legend with a black line it may be a little difficult but this represents where the design and construction was as part of that schedule from october 2019 so as an example as we go through here for the top project the animal service center you see that black line right here okay that represented where the design phase was supposed to finish under that conceptual plan back in 2019 i'm sorry let me get back to that so currently with everything that's happened this is the representation of where we're currently at and the estimated schedule to go through the bidding and construction so for each and every project you will notice where those original timelines were and where we are estimated to complete one thing i did like i do want to point out is based on the slide at the beginning all of the projects are supposed to be completed by the end of year 2022 this is that timeline and this is when all of those projects will be done so yes there were some delays and we'll be going over those in the next couple of slides but this represents for visual purposes how that project has moved from its conceptual up to this point right now so as we move forward with what were those delays and how are we going to remedy those so first for the animal service center uh you'll notice on there that we have some bulleted items for for each so part of the delay was that we added the dog parks to the design if you recall in the previous slides i mentioned that we're incorporating that as far as the construction goes with that project so by adding that to that project that delayed those design times for that project now how are we going to move forward to remedy and see if we can catch up on some of those things well we're combining and adding those dog parks to help expedite construction now some may say well we have the delay from the design but now we're making up for it by adding it to the construction uh this does a couple of things by adding it to the construction those sites that brinconada are so close together that by having one contractor do both of those projects and as we send them out that will expedite and help in coordination of those two projects for fire station number three some of the delays that we had was additional time for design and also for covid now i didn't mention this above but covet did have an effect on each project uh how much that occurred from project to project that depends on the ability from our design companies that we hired to be able to work through that initial health order some companies were a little bit more adapt to work with those restrictions and work off-site where other other companies struggled a little bit so again we had covid delays with all projects but we are working through those to try to expedite them as quickly as possible so for the additional time for the design at the at the fire station we had other things asked to be brought in as part of the design uh one of them being also the looking into the solar as part of the the project so going through there that did delay some of the project based on how far the project was along and when we incorporated those to be considered as part of the project now what are we doing to expedite some of those things uh we have are expediting the negotiations and the contract execution so we can get to construction sooner now we did expedite the rfp process but we did not mess with the integrity of the process the example that i'm giving is we were able to schedule those rfp meetings sooner to have them that way we could move forward with obtaining a contractor to move forward to negotiations the next project that we have is the east mesa public rec complex some of the delays that we had here was including the master plan to be able to complete that campus under phase two as part of phase one obviously we had the questions and what we had to build there obviously that did not suffice the needs of the community based on the feedback so we have the contract the design contractor do a master plan that way we can move forward under a second geo bond question to complete the campus now we are working with that designer to expedite the design i did mention that they are scheduled to be completed at the in january 2021 we are looking at all items on how we can expedite those designs to finish that a little bit sooner also we are separating out the access road and utilities as part of this project and staff is working in conjunction with that designer and we will attack that separately to get this moving sooner next we have the uni unidath park uh some of the delays that we've encountered there are some requirements from the new mexico environment department that is we do require to have a recirculating system as part of the splash pad now what that does is although we designed to have infrastructure in place originally and then install it at a later date we have since been given direction that we need to incorporate it with the project so this has caused some of the design delays with that as well that also includes additional improvements because of that because of that now we also have to provide other additional and amenities as far as restrooms and showering facilities so we're working through those and as mentioned we're trying to expedite those designs to catch up with these new requirements the hadley recreation complex again uh i said remember those the lighting and the musco those do do have anywhere from 16 to 20 week lead times and that's what we're looking at here is is basically those leads times to get those things here what we're doing is construction will begin there at the facilities depending on how the health orders go and whether we have to schedule to have certain facilities open for activities or if we have the ability to keep those facilities closed that will give us an opportunity to work with our contractor to complete some of those things sooner as crew times allow from the contractor for the park and sports courts uh the delays that we had there we we went through a series of public input uh there was additional questions at a park and rex advisory board meeting where we went back out to get more public information and then covet hit so that kind of delayed some of those meetings and how we were able to address some of those because we couldn't gather and also getting other information from that what we're doing again for that one to help speed it along is all our user groups and our customer departments they're working with those user groups to schedule some of these things as we move forward again this is dependent on the health order and what is going to be available at the time what can open what cannot open so we're looking at those opportunities to be able to capitalize should the facilities not be in use lastly the walking and jogging biking trails we we have run into some delays obtaining the permits through elephant butte irrigation district but we are working closely with them and expediting the design as you saw in the report before we're ready to go to get that approval from the parks and rec advisory board and then moving forward quickly to expedite that design and get it through the approval process so the next item uh is the program budget now if you notice each project is listed here now you'll look at the totals and some of them you'll say well some match with the questions and others don't please keep in mind that some of these projects are all under question one whereas three of them are independent independently their own question and that budget matches for example fire station number three replacement 6.2 million is listed there for question one we had the east mesa public rec complex unidad east hadley park sports courts and dog parks all under one question you sum those up and they would add add up to that question amount the next slide here is a program cash flow that has been supplied by ecm so up to this point in time right now the activities that have happened through design which are the planned which is the scoping and the design those are in blue as we're moving through and once we get to construction that line starts to scale up as these things get completed again if you notice we're out to 2022 and by this estimate it's in september now that's the blue line of the anticipated improvements through design and construction the orange line dictates what has actually happened as you can see it's mimicked that line fairly closely and what we'll start to see now with some of these designs completed and negotiations underway and some starting construction we're going to see those activities start to shoot up and that's what this line will also do is once we start completing those tasks and paying for them we should start moving here our goal is to have this orange line exceed this line to try to catch up for some of those design delays that we've seen and with that mayor and council both i and tony trevino are available for any questions from council david very impressive presentation very clear and concise and um good job thank you sir counselor beta stevie and counselor ben como and [Music] thank you and thank you david i also was very presentation i just have a few questions you hit on a few uh some of mine that i had but going back to slide nine we have um the unit ed park update um with those design structures i think it's one thing that um is important i know to myself and to many others but um having things be inclusive of all abilities when we have children and so are there kind of like 88 elements in here so that um perhaps if we had those with different uh ability levels to be able to participate at every park and so at this park would they be able to participate uh mayor councillor beta snoopy this is tony trevino the interim uh deputy director of public works um that is a great question if you can see that picture on the lower left hand corner there are several ramps included there so that was our attempt not our attempt that was our design basis to make the um ada accessible for all the elements of the park um we did want it to kind of make it elevated as the existing park is it's gonna have some platforms some elevated areas for the parents to see their children up playing um in the middle you can kind of see a little um kind of circular kind of sitting area there just to the right david right there um so that it's all elevated for um wheelchair accessibility or or um all access i guess you can say so yes ma'am so it is fairly large it is spread out just to make those um race platforms successful fantastic thank you um and i know how loved it is that it um had that wood feel i know as a parent i've crawled after my kids in the little tiny spots you know and gotten stuck myself um so i know it's so well loved and so i'm glad to see that those design elements are included in here um and with the when the splash pads um just a clarification um from slide 11 on our different basketball courts um just to make sure we have hill rise also listed okay um sorry i saw hill rise on one but not on the other so i just wanted to go back and check that um and then for slide 13 when talking with a new dog park is there a pathway that goes from that new dog park to those existing restrooms because it looks like you do have to cross kind of a bigger street so is there um any sort of consideration or sidewalk um notification that will be there to help with pedestrians uh mayor uh council celebrate this to me this is tony again um at this point right now there is no existing sidewalk there's some millings which is recycled asphalt laid out in the parking area and the roadway around the soccer fields um wayfinding signage will be incorporated as part of this directing the public to where those restrooms are so that is something we'll definitely look at um for um access and the route to those those missions so thanks for bringing that up that is a great great question so we will look into that okay thank you yeah and then um perhaps proper lighting then as well um just at least uh on the roadway okay thank you and okay next up um i have it all by slide number so um with slide 25 and 26 i do appreciate the um difference the chat about the delays and the rabbinities first by 26 can you explain a little bit about this particular lighting it does seem it does have a kind of a long lead time and so what makes this lighting kind of the thing that we need to use uh mayor councilman this is tony again so the moscow lighting is a um the type of lighting that parks and rec is going with when all the parks this um allows for their maintenance schedule their their use of it their their control of it it's kind of like um how the utility department has your scada system where they can kind of utilize and control the entire system from the computers in the office so this gives them that ability to control all the lights within within the city and all the parks so this is the route that they're going for with all their lighting um you can see these lights on the new um the soccer fields the van damme soccer fields these are the new values they installed there and to keep it consistent throughout these will be installed throughout the handy complex fantastic thank you and then as we move forward with these projects um and we're looking at contracts um for construction are we going to have language written in kind of for protection of completion since we are still in a pandemic and we know that um there are very unusual circumstances that can happen with companies with people and things like that and so i want us um just to make sure we still do have obligations to complete these as near on time as possible but what type of considerations are we looking at at the city to kind of protect those investments when we are sending out these rfps and mayor councilman stevie well we have written under contracts and what legal is um kind of making sure that we have in our contracts is liquidated damages based on the the final contract data when the project should be done the amount of these liquidated damages is cost per day for each additional day after the contract is uh completed um and the amount per day is based on the total amount of the project the higher the the amount of project the more expensive the project is of course the um the liquidated damages will be a higher amount for each day so that is um added to each contract as we move forward and that is actually in every contract that we do at the city roadway or anything we do fantastic thank you yeah counselor if i could add to tony's item so we do have the liquidated damages as part of the contract we also have each contractor provide bonds so both performance and material and labor bonds so should anything happen obviously you mentioned the effects of covid and hopefully nothing does happen to our contractors that that we hire but should it we have the ability to place a claim back on that bond to complete the project so if for whatever reason something happens to the contractor we have the fullback to go on the bonds to complete the projects okay fantastic um and then do we anticipate or have built in any sort of um accommodations if there are state issues that we have to look at um once we send out these rfps is there anything that we have on the city side that we have to be concerned about um with sort of limitations or what would limitations look like um that we might have to deal with on the city side later on mayor council made this to be the only limitations that we have right now where we deal with the state is some there's some primitive uh like it for example the fire station we had to get into the city count to permit their own projects we had to go out to the state to the state cid um construction industries division but the way you've been trying to accommodate that is actually go for the permit during design so that is some of the the items we addressed during design where we submitted everything to the uh the state for the pre-approval so once the contractor is on board all they got to do is get the permit the jobs have already been approved reviewed approved and just ready for the payment and the release permit so that is the stuff we've been kind of trying to address in the forefront fantastic thank you and you know this project i think can be so special for everybody and bring in so many different elements for our community and that's why i know it's so important for it to get done um within the time frame that we've kind of promised the public and so i really appreciate the transparency on looking at all this and having this meeting today so thank you david thank you tony and thank you mayor thank you yeah thanks councillor uh next is councilman cuomo thanks mayor thank you so much um david and tony i just have a few questions um in terms of the dog park timeline uh so are they all gonna be in construction at once or are you building one and then finishing that one starting another one and they just all have to be done by that date um or how how are the dog parks um going to be constructed mayor councillor ben cuomo uh good question the the scheduling of each project since it's going to be the animal service center as well with two dog parks we give a timeline to the contractor when everything's got to be completed however it's up to them to provide a schedule of what they're going to be doing how they're going to utilize their forces or their um their teams and everything to get these projects done um some of the not delays but some time that kind of taken is that we're not going to a straight bid on these projects we're actually going to an rfp based on qualifications for all these contracts so as part of that packet that they submit to us not only the cost but they also give us a schedule of how they're going to coordinate all these items all these tasks and get them done within that scheduled timeline so we just kind of give them an end point and their means and method and how they get it done is up to them to get us to that date okay super helpful how throughout the range of the contract how often does council get updated um mayor comes to bancomo like mr cedillo mentioned at the um beginning of the thing uh we'll be coming back up to our regular quarterly meetings for for the geo bond kind of like where we started last year and we kind of got sidetracked with the current situation going on but we'll be back in january to give uh a quarterly update okay great and then tony since i have you here um in terms of for the jogging path i know the um i know there was you know some discussion some disagreement perhaps and i i absolutely know that we can't you know meet everybody's expectations that would be crazy but i know that there was some pretty serious concerns and i just i hadn't um touched back touch base with public work staff on on the jogging um trails in terms of like it being on valley and some of those bigger concerns do you feel like you're closer are you at a confirmed design already actually so um a couple about a month or two ago we had a presentation for the b-pack the bicycle pedestrian i forgot the other two yeah but so we met with them um we we presented our alignments for each of the trails and what we kind of clearly noted there was our detours off the original alignment where our is our in interim trout connections is what those are called so for example we have the army hill lateral we're getting off on parker or palmer going down second and fourth and tying back up on halle and the other one is on the army hill going down amador to tie into the messiah drain into burn lake so those are going to be um signed as our interim child connections too we can get the the right away the the proper crossing um infrastructure for some of those because a lot of them are crossing picacho amador valley uh some major roadways in the city so we got to have the proper crossing infrastructure there whether it be a hawks hawk signal more signage or whatever it means that is when we get into that study we can properly address those issues and have them cross at those locations so yes we had that meeting um we i we had their i don't it wasn't acceptance but we had their kind of proven to move forward with these with that but that signage being called interim and temporary so it's not it's known to everybody that's not the permanent alignment that we're still moving forward with the final design for the alignments okay and then yes i knew that there was discussion about hawk systems you figured out where those are going to go already we have the vocations and we've applied for some grants with nmdo d.o.t unfortunately we did not get those but um yes one is at 17th street at picacho and the other is at 4th street and picacho so we are still going to look for how to adjust those in the future 17th and 14th no 17th at picacho and fourth in peacock of course there is no safety well there is but yeah i'm not questioning yeah that's like yeah yeah um okay that's really helpful to know um and then on valley you're just using like the roadway still just like the actual you know flight crossing yeah actually on valley drive we're not going to be um going along yet we're going to be crossing that newly constructed intersection of valley and amador and we're going like that's um buffered bike lane already on amador that separated bike lane on amador to go down to the uh maciadre okay um and then my last question is around the uh firehouse i knew that there had been some concerns um regarding previous fire houses and contractors and some delays how do we ensure that we don't go back to some of those same contractors um mayor constantine cuomo um what was done prior we just kind of put a bid out and went with the lowest bidder kind of whoever gave us the cheapest prices who we were obligated to contract with um and that was pretty that was a time time saving it was wrong you know to streamline the project however now um kind of based on the way we're trying to go with the city and ensure the quality that we get it's a uh rfp so we not only is based on price which is a small portion of it but it's based on previous performance qualifications their current workload of how they they can handle it so it's um goes to our selection advisory committee once they once they submit those we got a team of um uh subject matter experts that will review the rfp score it rate it and then we'll discuss it and based on who comes out the highest is who we begin our negotiations with great that's wonderful to hear tony thank you so much i appreciate it [Music] okay thank you maripo tim yes thank you um tony and david um um could you turn oh you are at 10. the question i have is how the distance between the splash pad and the park feature or the playground feature what is the distance and um i noticed there will be grass in the other well currently it's i think wood chips or some wood chips some different type of material i guess i'm concerned about safety and the kids running from the splash pad over to this playground mayor mayor pro tem gandera what i'm going to do is i'm going to move a slide back hopefully this you'll have better a better view of the proposed location now yes that was a factor as we were looking at the design and tony can correct me if i'm wrong but yes that was a concern with the area that's out here and i believe it's landscaped i believe the wood chips are further inside the park but you did have some grass area that's out over here that was a concern of not only bringing debris or grass or anything that can clog the system so we looked at other materials that could be placed around it some harder surface coupled by some landscaped areas and provide areas of access to that feature as we come through to be able to do it in a safe manner and transition great thank you good i'm i'm glad to see that you know um i was part of the community that went in i was working at the department of health at that time and with gail padilla and others and so the community took such ownership in terms of building right the the park and um i know that we are on a time crunch and we have all these deadlines um but i'm i'm wondering if there is um a way that we can involve the community moving forward because the community has been such a huge part of of um you know designing and actually building the park hence the name united park right so that would be my only recommendation um moving forward and i don't know if there could be um small activities for people come in um you know to do that and i'm not sure that um litigiously were able to um do that but in terms of liability and such but i i am [Music] i know that the public has been um although i hadn't participated in these kinds of public meetings for the park specifically to you know that part um i know that i've had a lot of families very concerned about tearing down right the playground um because it's such a beloved part so um david have you had any or maybe considered that thought of involving community in such a way that they feel like um you know they're a part of the build-out mayor mayor pro tem gandra first of all thank you for your service on the initial building of the project as i mentioned earlier before you know that that project had a major impact to the community and you're right it was called unidot park because it united the community as we came forward with it one of the things that we'll take a look at is you mention it already but there are liability issues as we move forward now we can look at certain options maybe some some things that we can do prior to the starting of construction uh you know we're going to have a virtual ground breaking for the fire station i don't know if it's possible to pop probably do some type of community vent where people that had part in it before construction begins and maybe either have uh some type of a ceremony or they come out and they may be a few select people obviously depending where we're at in the pandemic and the health order maybe some community members remove a piece or two from the park uh and then that way it may not be a complete involvement but at least that's that's maybe a possibility as we move forward but we'll definitely check with our legal department as we try to incorporate something like that into this project thank you david for your consideration i would really appreciate just knowing again it that holds very special memories to me and i'm sure to many uh in the community that assisted in this in this process so anything that you could do to help build community right especially around this park i think would be i'd be grateful um on slide 12 you have a list of all the parks and the various upgrades or different things that are going to happen but i don't see um maybe a list of what those the rehabilitation is going to look like can you at least um for my purposes for klein um for abalakka lions park um tell me what those might be because i've been asked mayor mayor pro i'm gonna let tony go ahead and fill you in on what those improvements are going to be at those locations thanks david put me on the spot um let me try and remember this uh mayor constantina um klein park is going to be a a rehab of the basketball courts uh hillary is a rehab of the basketball courts which is going to be some some stripping and clearing of the top layer of the paint and everything there will be some leveling some sealing of the cracks and then a resurface on top of them um four hills is the same the paping community center i want us i believe that one's just a rehab and the only reconstruction of any of these parks is apodaca and the metro rarity basketball park are you only going to be reconstructed uh courts everything else shouldn't be just um rehabilitated uh stripped leveled out grinded down crack sealed re-leveled and then um apply to some kind of surface for the paints in the markings sure um tony specific to apalaca park i know there's been already some improvements there with the rock right the landscaping around at least on the side i haven't crossed over to really paid much attention but um on the the solano madrid side right there's some um nice uh landscaping that has been done can you be a little more specific in terms of and if you don't have that if that's okay if you all could send me something more specific i'd appreciate it so for apodaca park uh mayor uh um the existing concrete slab is going to be redone it's going to be removed and reconstructed within the no i apologize i take that back we're going to add an additional eight feet to three of the sides on that on that court to accommodate um eight pickleball courts with some additional room on the sides some benches and so forth we're going to add some lighting we're going to do some ada improvements some new nets and fencing in there as well as grinding it down cleaning it up leveling it out and applying a three layer acrylic surface two of them will be a textured surface and the last one would be a colored surface on that court tony have you received that funding from the feds there to start moving into the other apolaka improvements that we want to make their um like the removal of the swimming pool and the splash pad and those things uh mayor mary potem i would have to defer to parks and rec on that or maybe mr cedillo has an idea but i am not aware of that ram that i don't know okay mrs leo or park and red anybody good afternoon mayor mayor pro tem this is sony delgado director parks and recreation we have not yet received that grant for that portion of the park but we anticipate to get that but we're not exactly sure when that will be okay i know i've been asked so i'll be happy to talk to some of our federal delegation to see if they can check on that um and and just connect the city with that um david slide 19 that's for the animal services center and the solar panel now the solar pva that will be installed um can you talk to me a little more in detail of what that entails and if it means actual actual solar panels would that affect the older building as well and if it isn't are there plans in the works to um put solar and that older building because i would imagine it uses a lot of electricity mayor mayor coach this is tony trevino again uh david can you go to the next slide please so what we're looking at doing here for the solar panel now this was a a rendering uh prior to it but those yellow areas in the back where the shaded for the the dog runs especially that long one in the middle is what we're going to be installing the solar panels okay so we're going to incorporate it into the facade in the building structure um and at this point it is just going to facilitate the new building it won't be connected to the existing building uh to the east okay thank you tony um page excuse me slide 20 and the old station what are we going to do with it is good did i i don't know why i'm thinking it might be for storage i don't know what will we do with the old fire station may approach him i believe at this point they're still going to utilize it for storage of some vehicles and everything i'm not sure if chief is on line here or deputy g smith help answer that but i think they're going to put some of their existing vehicles and storage for there for now looks like chief enriquez is there yes can you hear me there yes yes um yeah we we'd like to have it evaluated once uh once the new station three is built and then see what it looks like as far as maybe a structural engineer design but we'd like to keep it especially because of the bay area to park some of our reserves there and keep them out of the elements good oh good i think that would be helpful for sure i just i hadn't heard what we were going to do so i appreciate it um yeah i i just i thank you for all the work i know kova certainly put a wrench in some of this um i i know um that in past um in the past when we've talked about contracting and bidding that sort of thing um you've included a provision there um for folks who might be late in terms of where they're at with the the the building the build-out does that provision exist tony and or david and specifically what does that say i i think that at one time am i dreaming this up do you charge them daily right for the number of days that they're late is that something that happens still may or may protect no you're exactly right i can't before those are known as liquidated damages which is based on a fee per day after the contract has expired um that amount per day is based on the amount of the contract price in its entirety so it might go up from a couple thousand dollars to a day or a smaller project just a couple hundred dollars a day just depending on the overall contract price but those are i'm included in all the contracts from public works as we move forward whether it's a roadway project a smaller one or some of these bigger facilities okay very good um thank you those are all my questions i appreciate all your work thank you mayor pro tem thank you mayor pro tem counselor flores and then counselor vasquez thank you mr mayor and thank you mr trevigno thank you mr cedillo for your um presentation and your answers your thorough answers um i um so my question i have a couple of questions one of them is did didn't we have a isn't there a requirement under the globe on to have everything fulfilled by a certain date or did i misunderstand that mayor comes to the photos this is tony teruvino again no you were right it is um as stated in one of the previous slides it's the the end of the year of 2022 uh you're muted uh councillor flores thank you mr mayor so the prediction at this point mr uh travino is that we will be done by the end of 2022 and that is everything's in motion at this point is that correct correct with our our longest project our longest time of a project is the east mesa sports complex and that is um scheduled to be completed in september of 2022. um this schedule does allow us we did allow us some buffer as part of this construction schedule of our estimated timeline and that will be uh stipulated in our contract negotiations with the contractor with regard to rfp proposal or the construction of it does that include the um the uh the structures infrastructure that wasn't part of the gold bonds such as the roads and utilities well that too will will that be done by then too or is it just the uh the fields mayor comes to the photo so that will be done we have um we have got some additional bunny funding um money from bonding you applied to that um the sonoma springs access route and also the camino coyote uh access route so let's kind of have a little uh i guess you can say predicament here is we have no way to access that site right now to do the construction because it's on the very east side of that blm property so we are working with a consultant right now to get a temporary kind of construction access through camino coyote so they'll be able to have access to get to the site and do the construction while we build the sonoma springs out in its entirety with all the utilities and stuff going forward so they'll all be done they'll be going on at different times with some different contractors but yeah i'll be there wow wow so uh uh councilman cuomo asked a question as to whether uh different uh projects would be um working in tandem or quantum or whether they'd be um like one contractor gets done and then moves on to the next one but i think your answer was that they would be in not necessarily in tandem but all at the same time like in a quantum manner where um all projects i guess we have different contractors and is it did i understand that correctly yes ma'am you are you are correct it would just be a coordination effort on our part great thank you now as far as desert trails community park i didn't see anything as to what exactly would be done there do you have any idea and will there be any more focus groups or community groups participating in its fate uh mayor councilman flotus no at this point we've had two public meetings and we also went to the parks directorate board on uh the desert trails park and what's down is it's just off the study and analysis we had done where the user department had a analysis done on the all the erosion taking place on that park and it's causing a lot of the damage to the existing trails and access and parking lots there so what this project is going to include is just all the erosion mitigation for these for this area some of those hills are kind of steep and a lot of sediment to get on the trails undercutting of the trails which is impeding some of the access along those trails for um all mobilities so this is just going to go and mitigate a lot of those issues that we have throughout the park um we did present that plan and all the meetings that we had we had one at the leave the east mesa safety complex they did that plan over there and also to the parks of our board so it's the same plan that we've had from beginning okay so um i just want to make sure because people are asking whether people are still worried about the original uh was it the original plan um i think um ms delgado is familiar with that excuse me with that um commentary from from the community in this area uh that um that the park would be developed in a way that it would make it a park a regular park with a playground and picnic and grass and everybody uh was against that vehemently and so there isn't any plan like that correct no ma'am this is just for the erosion mitigation just the dirt yes how much was uh how much has been spent on that erosion plan or study i imagine you got geologists excuse me hydrologists to look at all of that i would have to get back with uh parks and rec they hired a consultant a couple years ago two three years ago to do the um analysis and we're just carrying that forward what do you mean there's been an analysis ordered three years and we still don't have the results or report on that the analysis is there but now we finally got money for the construction of it for the actual implementation and that's what we're doing with this geo bond funding would it be possible to give me or if anybody else is interested on city council um to give me that plan or that whatever you call it um to carry that out i'd like to say that yes ma'am okay thank you mr trevino and thank you mr serious thank you thank you mr mayor hey councillor vasquez mayor um thank you tony and david for a great presentation for this update that you gave us on all these projects i know it's been uh something new to manage this amount of uh of design and construction and planning and working with so many different uh contractors i'm sure is uh is a significant undertaking on on your part in addition to all the other work you have to do so i want to recognize that and say thank you um i don't have any particular questions or comments that my colleagues haven't asked thank you all for for asking terrific questions um i'm excited in particular about the improvements um to the hadley uh sports fields and as well as to we need that park that's super exciting that there's going to be a splash pad there and you know i know that especially during baseball tournaments or softball tournaments or just you know local uh practice man kids would love to use that splash pad while you know the um maybe the the other kids or their brothers and sisters are playing in a baseball game i could see you know the moms and the dads taking their kids out to that splash pad to just have an amazing time together as a family and they could all be doing something different as part of that complex skate park is right around the corner you got to be at max track i mean talk about a cool facility for the city just getting a little bit cooler i'm so i'm really excited about that um uh actually i did have one quick question on the klein park basketball court uh is it my understanding there was a private donor that was gonna extend that basketball court in the past um to like a regulation size and is that still how anymore mayor councillor vasquez uh i believe parks and rec has more information regarding your question there so i'll def sunya delgado in parks and rec okay uh good afternoon mayor members of council um councillor vasquez uh that gentleman's name was jose traviso and he was from full court fiesta and he wanted to put together a tournament and in doing so he's going to get some sponsors together to have a basketball tournament there at klein and he was going to redo the entire basketball court so on the list of gold bond projects that's why klein is listed last uh we're going to give him some time to be able to get that done he's currently in the process of putting together the funding pages and the sponsorship pages and they should be coming out soon i just spoke to him last week so we wish him well and i hope you can get that done it's going to be a great project okay great thank you so much sonia and thank you tony uh the only other suggestion i have and i think we may have mentioned this the last time we talked about the go bond in a work session is some signage for the project locations um i think we we said that there might be some old cip um project signs in a stu in storage somewhere in a warehouse somewhere one of the ways uh that i knew what some of the city projects were as part of our last capital investment kind of campaign was those big signs that were in front of the project locations that detailed how much the project cost i believe uh the description of the project and i forget what other information was on there but i think in terms of communicating to the public that these geo bond projects are moving forward and holding ourselves accountable to a completion date or even just summer fall 2000 2021 2022 it would be i think terrific to have some signage in front of each go bond project because that's really where the interface is going to happen while the public is using those parks or using those facilities they will know that a renovation is coming and i think you know to communicate better with the public in addition to our city council and our public information office having some signs in front of some key projects that details what those you know what what the investment is what the renovations are and when our expected completion date is i think would serve the city really well to get information out there and we'll let folks know that progress is coming and so i don't know if those signs are still out there that we talked about recycling last time and perhaps printing over i think udell um had mentioned that but i'd love to see those signs and have like a geo bond logo at the top and let folks know that these things are happening mayor councillor vasquez david sevilla for the record uh we are currently working through that process to get those signs up we're working through our artist to get that design the specifics for each project and then we'll work with a signed company to have them printed on those other signs that we had so worse that is still going to happen we're in the process of getting those uh through other means and not as part of the funding for the for the gold bonds but yes we agree that's very important to to be able to advertise to the community thank you david and it helps hold us accountable to those to those completion that too so that the public can expect those those uh project no i think those are all my comments uh thank you again i apologize i think my connection might be a little bit unstable here but love to see those signs popping up soon and thank you guys for all your hard work i'm very excited for this and um hoping this is just one of our first gold bond um i hope we can have some more in the future too it all depends on this one though it's all writing on this one thank you guys thank you counselor thank you counselor come on oh here we go it's a little slow and reacting here of course as usual um thank you mayor and thank you to all the staff that's done this reporting here today big complex uh projects we have going here which brings to mind um the we hired a project manager outside project manager for all these projects did we not uh david mayor councillor sorg yes you are correct that is okay okay um is that project manager still working on it as as as planned yes sir the that project management company is still working through right now and will be working through completion of all google okay that's good that's good i'd like to like to hear that um some comment was made uh with some basketball courts in metro verdi uh and then i see on this slide 11 that uh there's a tennis court in metro verde too it's in the project these are brand new basketball and met and uh tennis courts and i thought i heard um tony maybe it was said that they're going to redo them they're going to rebuild them again is that right mayor it comes with sorghum this is tony trevino again um yes sir when the basketball court at metro verde was built constructed there is a major drainage issue where water does not get off the court has seeped through the cracks and has caused some damage to this upgrade and made some uneven areas in that on that course okay too bad we didn't catch that before they built them yeah something to think about for the future maybe any parks that are built out there or anywhere in the city uh something that we want to keep on top of so we don't have to waste our money rebuilding things um and then finally last a signage that councilor vasquez has talked about is awesome um that's something we definitely have to do i can remember our community development projects we had um when we passed the three-eighths um grt tax increase we had several projects that were community development to kind of forget the exact name we had on it but there was several major projects and we had a large sign on each one of them and that really uh is a good thing so carry on on all everyone tony david's staff and everything and thank you mayor let's let's go forward thank you thank you counselor uh counselor ben cuomo last question for tony um tony on the hawk system i'm curious the one on fourth street i'm curious if we've had conversations you've had conversations with um the schools i know that macarthur is right there and they're now a community school i'm curious if that could be a partnership to at least bring one of those hawk systems to to that area mayor councillor ben cuomo we definitely have spoken with the public schools on this because right there is their major crossing for apricot and that is why we located this crossing right there and we kind of did a detour of that alignment the other one was going right along the railroad which is due to safety so we did push it off to an existing crossing so we have discussed it with public schools and have been in discussion with nmdot okay and that hasn't come to any fruition yet uh on that conversation we did apply for the map grant for that project but we were not successful and so we'll figure out and try and move forward with that in the future how to get that taken care of okay that's awesome you guys really do think of everything so thank you okay well very good well gentlemen thank you again for your presentation um as counselor said councillor sorg said just carry on looks good thank you thank you okay so last item is 3.3 the business retention and expansion i guess free and business support for recovery so dr martinez riscella martinez and elizabeth peters will be making the presentation good afternoon mayor and city council my name is elizabeth teters and i'm going to be doing the presentation today here on my screen okay can you see my screen yes okay great so we call business retention expansion bre just for short um so what is bre the definition of bre is it's an economic development strategy of proactively connecting with existing businesses to understand and respond to local business needs so basically that is taking a proactive approach to business development a lot of times you think of economic development and business development as reactive so if a business is about to shut down or something like that they go and they seek help to you know hold everything together and to stay open so business retention expansion you're doing you're meeting with businesses more often you're talking to them so you're aware of what's going on you're connecting with the businesses and you're understanding what's going on in their business environment and so you can respond to the needs before it's too late um and it's also understanding the business climate in las cruces so by creating this bre program we are going to have a better idea of how businesses are doing and you'll hear me say a few times you know fill in the gaps if we discover there are needs not being met or programs not in place we're going to be able to go and work on new programs and whatnot to make sure that our businesses are getting what they need so the basic idea what it boils down to is that we are here as an economic development department to help the businesses and the employers so our timeline we started the program in august it was uh our basically our program set up in september we did our initial outreach now this is a pilot program that we're doing in the west mesa industrial park we chose the industrial park because the market street study that was uh completed recommended that we do a pilot program in the industrial park and then expand the bre program to the rest of the city in phases beyond that so in september also we did uh our bre launch so after we did our initial outreach we sent emails and we made phone calls um we did a launch at the end of the month where we invited the businesses from the industrial park to do a virtual meeting with us so they could ask questions and we had all of our partners there too this month we are starting our industrial park visits so after the launch we'll generally meet with them one-on-one and that's when we start talking about the business needs and their business themselves and then we're also starting our second phase is going to be manufacturing and outdoor recreation so we're starting to plan that process and planning when we're going to start reaching out to businesses and doing the launch for that for that sectors those sectors and then in november we're going to continue to do our visits in the industrial park and do also do outreach to the manufacturing and outdoor recreation so the bri process we spent a few months like i said doing setup so this is where we talked to our all of our partners and figured out what programs are already in place so that way when a business says that they need something we can go and say oh so the sbdc can assist you with this and we can make that connection for them and from there we did we set up our framework which is what i the timeline basically i just described to you and the rest of this is all it's continuous all the time so gaining support that's our emails and our phone calls we're letting them know this is happening we're doing the information gathering now even though we haven't met one on one with businesses yet we have already had businesses say you know hey we're thinking about expanding or you know we need workforce development so we've already started making those connections uh once we do the the visits we're gonna analyze the results and this is when filling in the gaps comes in we figure out we we pair the businesses with their needs with our partners and then we um we start filling in the gaps and we report our findings we figure out you know our next steps and this is continuous so you'll hear sometimes that business say that they hear from us and then they never hear from us again that's not what bre is about we are going to always be in contact we are they are going to know that they can come to us at any point and they are guaranteed at least one visit a year uh to go over their business and their needs and determine if there's a way any way we can assist them so um we'll continue to do this we'll keep pairing them up with their needs as long as they need it so that's kind of the process and that's what we're going to be moving into with manufacturing next as i said uh we met with our partners oh there you go as and you can see that we have quite a few partners involved in this i'm i love the relationships we've gotten with this and how much everybody wants to be involved in this because we're all in it together we're here to help the businesses so this is just a slide of all the partners we have so far and we are adding partners all the time as we realize that we still have gaps we need to fill in and we've come up with four basic focus areas for businesses so we have innovation financial growth and training right now obviously financial is one of the biggest ones because of coven 19. but these are our four main areas that we have discovered with all of our partners that we are able to assist businesses now that doesn't mean that's all we have you know if somebody has a need that we don't feel like a partner fits with we will do the best we can to assist them how we can so our next steps is that we are going to continue to meet with the west mesa industrial park businesses we're going to pair them up with the needs with the resources figure out the gaps we have and then we're going to move on in the next month or so to manufacturing and outdoor recreation and other than that with uh with cover 19 like i mentioned we do have other business recovery programs in place that we've been working on beyond bre so even though we have such a small area of the city that we're focusing on bre we have other programs in place and if a business comes to us and wants to do a visit or wants to do a consultation we will do that so we are not just focusing only on that area it's just to get the program in place we wanted we didn't want to take on the entire city all at once but some of these other programs we have we are partnering with nmsu's arrowhead center to do a bit what we call bizprint and so these are business accelerators and in we've had two different cohorts one from august to september and one is starting this month and going through november and we've assisted a total of 30 businesses and um it is an eight-week program that is assisting businesses during covid so marketing e-commerce all um all that information that you need to be successful in a pandemic basically we also have with the arrowhead center we're starting a social media program it actually just started it's six rounds where we're gonna they're gonna assist 72 businesses and this is social media basics it goes back to the marketing and getting your business online and this will be going on from october to um to december december lift fund is an organization we are partnering with and uh they do by bilingual business con counseling and technical assistance and they have monthly digital workshops that we're they're doing as part of this and the one coming up this month is actually on wednesday and it's also on marketing we have they're partnering with the arrowhead center and with the green chamber and so this month has really been focusing on the marketing aspect because we found out a lot of the needs that businesses have right now is getting their getting online and getting like selling themselves online so that's kind of where our focus has been which is why i keep reiterating that we're doing marketing um as you guys know we have the the small business continuity grant which is the cares funding and we also have a business concierge on staff um donald bustos is our business concierge so anytime it's for business development and business assistance anytime a business needs anything they can call or email him and he will you know point them in the right direction or assist them however he can and we have recently updated our website with the economic development portion with business support so all this information is on our website and you can click on links that'll take you directly to signing up for these programs and they're all free so businesses can do that they can sign up for the webinars whatever we have going on it'll all be on that website so with that i will stand for questions well thank you elizabeth too bad you couldn't go faster but it's still good just kidding looks like councillor flores and sorg had their hand up or from last time did you guys have questions mr mayor yes i just wanted to comment that uh i'm really pleased that this uh is happening this is working here in in the city and that we're doing this this is what i referred to as economic guard part of economic garden uh gardening um you know eight years ago so um i'm so glad we're doing this and and elizabeth eaters you did an excellent job presenting it and i appreciate that and um i um i thought i had a question but i think i uh i think she answered it pretty well so carry on and uh thank you so much thank you mayor pro tem thank you um elizabeth and economic development department they did present this to our econ prc and we asked that it be brought to the council as a whole um i think i i'm really impressed with um how quickly the department has pivoted to help many businesses i do want to say um i i was a little concerned about the pilot being at the west mesa industrial park um that i thought during covid um there were other bigger issues um but i i also know that as they start it seems like they're getting some traction where folks want to expand their their um their businesses so i think that's that's great um my questions are around um your do you have a metric like what metrics performance metrics are you do you have in terms of this pilot and what evaluation component exists so that you can go back and improve moving forward or change things right in the midst of things aren't quite working like you think they need to we don't actually have any performance metrics written out but we have been keeping track of every business we've been talking to or you know when we make the phone calls if a business answers and they actually have conversations we we've been keeping track of positive and negative conversations that you know if if they're not interested how many have showed up to the launch how much follow-up we're getting and how many are interested so far in having the visit so we're going to take this information with this pilot and we're hopefully going to move it into manufacturing and if we need to you know make some changes and then when we get a better grasp on the entire program i think that's when we're going to be able to come up with firm metrics um on what what our expectations should be but as of now since it's just a pilot we're we're testing the waters and we're just keeping track of everything and adjusting as we need to as we go thank you elizabeth are there other municipalities that have similar programming that maybe i i guess i'm concerned that there aren't metrics there's not an evaluation component and i my recommendation would be is to look at other municipalities that have similar programs um for me it's about um i mean you you have a hypothesis right i'm thinking and uh i'm hoping you have a hypothesis right and the work that you're trying to do is is is trying to to determine this is what our you want for in those two industries to you want to bring them and maybe it more like you want to expand i think is what it is um and so i i i'm a little concerned that we don't have that and we should probably moving forward um but those would be just the two recommendations that i have um currently um the other airport looks like dr payatis and dr martinez will both want to make a comment maybe they might be able to respond to your your question martinez yes mayor um mayor tem um thank you for for that comment um so what what elizabeth mentioned about not having metro specific for the pilot i think it's um we we go the reason why we started it was to continue to leverage on the resources we have in our community and put them in a systematic way to serve businesses as employers right and as investors and so one of even though we don't have um a specific metric for like the the launch date or the interactions uh a metric for us would be job creation as you mentioned any expansion of real stage so if they're interested in purchasing other parcels of land or they're looking to expand their current facility those would be metrics that we are tracking and they're part of our peak performance as well um also in the business support programs um part of the participants information that they're providing to us includes a number of employees right now like when they start the program number of employees after the program and the number of employees 180 days after they complete the program the same goes with sales so that's another really important metric for a business right and then that translates into a vibrant economy so the participants in the business support programs they are reporting number of sales when they start the program at the end of the program and then 180 days after so those are the metrics that we are utilizing right now for instance for businesses at the airport we have another metric which is facilities um list out right square footage of facilities another one would be if we have new hanger space that's another metric we have as part of the airport so we we have all these metrics at the strategic plan level that we're tied into all the different programs that we are implementing through the through the different programs i hope that answers your question you did thank you dr um martinez i appreciate that i just i just want to make sure um that that we have a plan a clear plan with deliverables i think that's really important and that you're that you're testing those out as you're moving through it and changing as you go but also at the ends reevaluating and saying yeah this didn't quite work out the way we needed to and another suggestion would be because i didn't hear it is typically i hear we don't have the workforce right and we need workforce training or retraining retooling those kinds of things and maybe a metric should be centered around something like that because i hear that a lot um i also hear when we talk about industry manufacturing that people um entities that are looking at us look specifically if there's warehouse types right large warehouses that we don't have and and so i'm not sure if you're still hearing that um moving forward but i i know that those are all really important um when i've talked to like our partners greater chambers and mavida so with that said um you'd mention that they're working with you um and i've always been concerned about um duplication i know some of this work mabida and others have done this how are we not duplicating and how are you using um mavida together to sort of lift you know this this um pilot um to the place where i think you would like to see it um yes mayor mayor putin as you saw in the slide where elizabeth shows the partners we definitely believe in partnerships and collaboration and preventing duplicating efforts and so as we are getting the feedback from the business owners what we're doing is we're basically um finding out in this ecosystem if there is the service that is already providing the help that they need and then if there is not how can we participate in influencing filling in that gap and so early in the bre process that elizabeth mentioned movida was at the table to talk about this program and to provide they provided their feedback and they're in constant communication with us in which we are informing them of the process and the things that we are doing and so um we're we're constantly asking about um historic data that they have had with leads which which is something that we do we start the process and then they complete it right and so this is this is a um an effort that needs all of us working together and we're putting a big effort in making sure that we do that in every single instance um and so um and then connecting the dots like for the social media support program uh we started with that program actually started through a conversation with the green chamber we went to a couple of possible options on helping us create the program and once the program was created with different um elements then arrowhead center that is it's the the one that we have the direct partnership for that program now they're partnering with the green chamber to then have a pipeline for the green chamber and other things that they're working on so it's in addition to that we are having regular meetings with the business service providers to make sure that we are talking among ourselves and and and these ideas that come up based on needs that we hear from the business community we work together towards addressing those those gaps okay if i can interrupt looks like elizabeth peters wants to jump in also yes i may or may approach him to follow up on what dr martinez said uh you know when we're talking to our partners a good example of making sure we're not duplicating is movita right now or they were working with the business out in the industrial park on workforce so they made us aware of that so now when we go visit you know we can say to them hey we know you're working with mavida on this but let's focus on is there any other needs that we can assist you with so that we're not going and we're just not basically asking the same thing that they're they're asking we're doing the same thing when we interviewed with all of our partners you know we asked them how much interaction have you had in the industrial park what are you currently doing out there so that when we we go to these visits we're all very prepared and we're not we know how busy businesses are so the last thing we want to do is just keep bothering them with the same information over and over again sure sure i can appreciate that thank you um you mentioned all the resources that the city has offered through economic development like bisprint your lyft fund and then the email one what would uh las cruces what are you calling it the one to help say that again you were kind of the social media program yes yes the social media sorry i can't read my handwriting i i stopped at social and literally what is that um so i i noticed that on the lyft fund it was just by bilingual was emphasized um i have heard some feedback about um i'm concerned that we are not doing um bilingual programming and um and what i mean by that is when you offer out the training that it's bilingual meaning simultaneous translation um not just things that you're handing to people or that someone in the group speaks spanish i think it's important that um that that in these programs that we offer awful um simultaneous translation or some some kind of translation i've been in enough meetings and conferences and different things especially in this in this um neck of the woods that you know a lot of folks should be um versed at that i know there's quite a few um folks that are are you know that can do that that's takes quite a skill to be able to do that but i i just want to make sure that we're meeting that demand and that in all aspects that we can and you know i've heard some feedback and and i just wanted to give that to you i think these are awesome programs i'm getting now calls i see the advertising on the social media platforms that i have and and i want you to know the word is getting out just today i got a call that they said they heard on the radio about the small business um continuing cares um funding so that's awesome it's really neat to see that people now are are really listening in and they want to know how to to you know to read who do they reach out to kind of things so all the work that you're doing there to get it out is is happening so thank you for that thanks mayor that's all my questions thank you dr martinez you had something else yes just to address the bilingual spanish and english um the the best prince they're not currently offered in spanish however we um had actually a conversation on friday with the arrowhead team and we are talking about how do we make that possible for next year and then for lyft fund they actually hired somebody to do the technical assistance business visitations and his um bilingual english and spanish as well as all the webinars that are being offered they were actually holding two separate um webinars one in english and one in spanish and because of the low enrollment on the spanish ones that what they have actually done is they have a tool that you download an application on your on your phone and in simultaneous translation so that tool is available and will continue to make sure that language is not a barrier to access to resources okay thank you dr martinez i really appreciate that i i i just think uh honestly and with the advertise i just i've seen it in english i haven't seen it in spanish so i i think that's a barrier it's a reason why maybe we don't have the spanish speakers right at the table um is because everything that's going on i want to say is in english or what i've seen and maybe i'm not at the right sites or whatever but i think again anything that we do to put out there on any social media platforms should be both in english and spanish thank you all right well that um thank you very much for that presentation i think that concludes that is that right uh elizabeth and dr martinez all right great okay so before we and i'm going to put counselor bait to stevie on the spot if if um would you happen to know i i received some stuff over the email and i'm sure the others have i can't have the others comment on this but can you give us an update about these trees that's that are allegedly going to be all knocked down or cut down i think it's got a lot of people on uproar i told some gentlemen i said you know what i i think we're just gonna go after some dead trees that are on in your district and i don't think we're gonna knock down all these trees can you just give us a quick update yes thank you mayor um yes tomorrow uh evening from 5 30 to 6 30 pm we'll be having our first um public participation meeting um to discuss the conway avenue uh tree canopy and there is about 16 to 20 trees that are dead or posing a safety liability hazard out of in the area and so it's the first of the public meetings to discuss that tree canopy safety maintenance and as it's an aging area we're going to talk about just aging infrastructure and what the community wants to see in the future so it is just the start of a few meetings just to get the community together um to discuss what they want to see but also to look at the safety issue that we have with a few of those trees there's going to be many community partners and staff available to answer questions if the public would like to participate they can go to www dot loss dash cruises dot o r g slash engage and register to link and they can register uh with the zoom it's a zoom webinar so we're going to be debuting it and if they'd like to attend i have a little invitation right here hold that up for a little bit and like i said it's the first of a few discussions so thank you mayor okay well thank you okay and then also did you all uh attend any of you the open meetings act um training put on by the attorney general well you did so one thing that i caught out of that was and i i always kind of wondered about it but when we adjourn and i just say all those in favor they had suggested that we have a roll call vote to let the public know who's actually here so if that's one thing that i picked up so i'm probably going to do that all right well if there's nothing further then i guess i'll take a have a motion a second to adjourn okay a motion made by a counselor gandara and second by counselor beta stevie so christine can you call the role please to adjourn sure so this is on the motion to adjourn the work session counselor beta stevie yes counselor vasquez yes counselor ben comel yes counselor yes concert florist yes councillor gandera yes and mayor yes okay good all right well we're adjourned it's 4 25 p.m so thank you very much oh i won't be leaving i'll stick around for the agenda setting and but we'll see you all a little bit later yeah did you attend that meeting christine the attorney general i didn't because i was off that day oh okay um but i really wanted to and i had all my staff attend it was pretty good like i said that's something i picked up uh all the rest i think we're all doing pretty good stuff okay yes i'm glad you asked christine if she was there because i have a question about that i was just going to sit in on this meeting agenda setting but so why would it make a difference as to who's still who voted to adjourn i mean robert rules of order doesn't require yeah i don't think they they don't recognize rules of order but i think it it validates whether or not a quorum was present i see thank you that makes sense anything else you want to know yeah but i thank you all right uh you ready yes i am all right this is the agenda setting meeting for the uh october 19 2020 city council meeting number one non-consent one non-consent two non-consent two non-consent three consent three consent for non-consent for non-consent five non-consent five non-consents six consent six consent seven non-consent seven non-consent and eight non-consent eight non-consent great thank you thank you see y'all later bye you